Menu

Wisconsin county

Portage County

1 district has called 18 school bond and tax measures in this county—11 passed and 7 failed (61% passage rate), totaling $40.6M in approved bonds.

Passed
11
Failed
7
Bond $ approved
$40.6M

Full results

18 tracked measures · 11 passed · 7 failed.

Showing 18 of 18

Tomorrow River School District

Override · Portage · Nov 2026

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2027-2028 $1,100,000; 2028-2029 $1,100,000; 2029-2030 $1,100,000 (total $3,300,000)

For

1,153

Against

1,603

For %

41.8%

Tomorrow River School District

Override · Portage · Apr 2024

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2024-2025 $900,000; 2025-2026 $900,000; 2026-2027 $900,000 (total $2,700,000)

For

902

Against

844

For %

51.7%

Tomorrow River School District

Bond · Portage · Apr 2022 · $21.3M

Passed

Referendum to issue debt (general obligation bonds): Construction of additions for science, technology, art, general, agricultural science and technical education classrooms, administrative and support spaces; renovations of existing spaces, safety and ...

For

1,047

Against

737

For %

58.7%

Tomorrow River School District

Bond · Portage · Apr 2022 · $4.4M

Passed

Referendum to issue debt (general obligation bonds): Renovations to school building to update middle school classrooms, family and consumer science and library spaces; infrastructure replacements/upgrades; and acquisition of related furnishings, fixture...

For

1,109

Against

670

For %

62.3%

Tomorrow River School District

Override · Portage · Nov 2020

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2021-2022 $400,000; 2022-2023 $400,000; 2023-2024 $400,000 (total $1,200,000)

For

1,897

Against

1,276

For %

59.8%

Tomorrow River School District

Override · Portage · Nov 2015

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2016-2017 $350,000; 2017-2018 $350,000; 2018-2019 $350,000; 2019-2020 $350,000; 2020-2021 $350,000 (total $1,750,000)

For

436

Against

148

For %

74.7%

Tomorrow River School District

Bond · Portage · Nov 2012 · $8.5M

Passed

Referendum to issue debt (general obligation bonds): Constructing and furnishing additional classrooms and a production kitchen/cafeteria. Renovating middle school locker room. Site improvements to include a fire lane/bus loop and fixing draining issues...

For

1,824

Against

1,034

For %

63.8%

Tomorrow River School District

Override · Portage · Apr 2011

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2011-2012 $350,000; 2012-2013 $350,000; 2013-2014 $350,000; 2014-2015 $350,000; 2015-2016 $350,000 (total $1,750,000)

For

1,158

Against

767

For %

60.2%

Tomorrow River School District

Override · Portage · Nov 2010

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2011-2012 $350,000; 2012-2013 $350,000; 2013-2014 $450,000; 2014-2015 $450,000; 2015-2016 $450,000 (total $2,050,000)

For

1,007

Against

1,149

For %

46.7%

Tomorrow River School District

Bond · Portage · Apr 2010 · $11.9M

Failed

Referendum to issue debt (general obligation bonds): adding to, repairing, remodeling, renovating, and improving existing school facilities; developing school sites; acquiring related equipment; and improving adjacent infrastructure, including roads, ut...

For

638

Against

814

For %

43.9%

Tomorrow River School District

Override · Portage · Feb 2006

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2006-2007 $350,000; 2007-2008 $350,000; 2008-2009 $350,000; 2009-2010 $350,000; 2010-2011 $350,000 (total $1,750,000)

For

548

Against

393

For %

58.2%

Tomorrow River School District

Bond · Portage · Jul 2002 · $2.5M

Passed

Referendum to issue debt (general obligation bonds): repairing, remodeling, improving existing school facilities and systems; provide handicapped access; provide improved air quality; and upgrade heating and ventilation and acquire equipment and upgrade...

For

794

Against

649

For %

55.0%

Tomorrow River School District

Bond · Portage · Jul 2002 · $1.9M

Failed

Referendum to issue debt (general obligation bonds): remodeling, improving and expanding existing facilities and systems, improving safety and security and acquire equipment and technology

For

591

Against

840

For %

41.3%

Tomorrow River School District

Bond · Portage · Apr 2002 · $4.4M

Failed

Referendum to issue debt (general obligation bonds): repairing, remodeling, improving existing school facilities and systems; provide handicapped access; provide improved air quality; enhance health, safety and security of facilities; construct connecti...

For

567

Against

645

For %

46.8%

Tomorrow River School District

Override · Portage · Jun 2001

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2001-2002 $350,000; 2002-2003 $350,000; 2003-2004 $350,000; 2004-2005 $350,000; 2005-2006 $350,000 (total $1,750,000)

For

851

Against

554

For %

60.6%

Tomorrow River School District

Bond · Portage · Apr 2001 · $7.6M

Failed

Referendum to issue debt (general obligation bonds): construction and remodeling

For

780

Against

994

For %

44.0%

Tomorrow River School District

Override · Portage · Apr 2001

Failed

Referendum to exceed revenue limit (recurring): $350,000 recurring

For

825

Against

960

For %

46.2%

Tomorrow River School District

Bond · Portage · Dec 1992 · $3.9M

Passed

Referendum to issue debt (general obligation bonds)

For

497

Against

260

For %

65.7%

Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.