Menu

Wisconsin · School bond & tax election

April 2010 Results

48 tracked measures in this cycle—24 passed and 24 failed (50% passage rate), totaling $102M in approved bonds.

Passed
24
Failed
24
Bond $ approved
$102M

Full results

48 tracked measures · 24 passed · 24 failed.

Showing 25 of 48

Altoona School District

Override · Eau Claire

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2010-2011 $1,250,000; 2011-2012 $1,250,000; 2012-2013 $1,250,000; 2013-2014 $1,250,000 (total $5,000,000)

For

891

Against

1,008

For %

46.9%

Barneveld School District

Bond · Iowa, Dane · $1.2M

Passed

Referendum to issue debt (general obligation bonds): school district building improvements including roof replacement, insulation and exterior finish system, science room remodeling and equipment acquisition

For

389

Against

154

For %

71.6%

Barron Area School District

Override · Barron, Dunn

Failed

Referendum to exceed revenue limit (recurring): recurring, phased: 2010-2011 +$400,000; 2011-2012 +$400,000; 2012-2013 +$1,200,000 (cumulative $2,000,000)

For

469

Against

1,066

For %

30.6%

Black Hawk School District

Override · Lafayette, Green

Failed

Referendum to exceed revenue limit (recurring): recurring, phased: 2010-2011 +$700,000; 2011-2012 +$100,000 (cumulative $800,000)

For

350

Against

617

For %

36.2%

Brillion School District

Bond · Calumet, Brown, Manitowoc · $4.5M

Passed

Referendum to issue debt (general obligation bonds): cost of remodeling and renovation projects at the elementary and middle schools

For

519

Against

383

For %

57.5%

Brodhead School District

Override · Green, Rock

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2010-2011 $393,000; 2011-2012 $567,000; 2012-2013 $797,100 (total $1,757,100)

For

960

Against

1,255

For %

43.3%

Cambria-Friesland School District

Bond · Columbia, Green Lake · $1.3M

Passed

Referendum to issue debt (general obligation bonds): various maintenance, replacement, repair and improvement projects to improve energy efficiency, increase building safety and maintain the District's building and site; and acquiring equipment and fixt...

For

470

Against

60

For %

88.7%

Cedar Grove-Belgium Area School District

Bond · Sheboygan, Ozaukee · $6.0M

Passed

Referendum to issue debt (general obligation bonds): renovating and remodeling the middle school including improvements to address safety, security, mechanical systems and Americans With Disabilities Act issues; providing a new computer room at the elem...

For

545

Against

419

For %

56.5%

De Soto Area School District

Bond · Vernon, Crawford · $2.6M

Passed

Referendum to issue debt (general obligation bonds): cost of additions, renovations, and improvements to District schools, including a well at Prairie View Elementary, roof repair, HVAC, piping and electrical improvements; classroom additions at Stoddar...

For

638

Against

530

For %

54.6%

Fox Point J2 School District

Bond · Milwaukee, Ozaukee · $3.3M

Passed

Referendum to issue debt (general obligation bonds): paying the cost of energy efficiency and facility improvements to school district buildings; technology upgrades and refunding a state trust fund loan issued to pay the District's unfunded prior servi...

For

536

Against

303

For %

63.9%

Fox Point J2 School District

Bond · Milwaukee, Ozaukee · $3.7M

Passed

Referendum to issue debt (general obligation bonds): purpose of funding the cost of providing post-employment benefits to the District's employees and former employees

For

417

Against

405

For %

50.7%

Passed

Referendum to issue debt (general obligation bonds): replacing computers, updating and expanding wireless access, and improving basic classroom technology at various schools in the District

For

11,786

Against

6,447

For %

64.6%

Passed

Referendum to issue debt (general obligation bonds): maintain,renovate,repair and upgrade school facilities

For

12,792

Against

5,614

For %

69.5%

Green Lake School District

Override · Green Lake

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2010-2011 $675,000; 2011-2012 $1,015,000; 2012-2013 $1,280,000; 2013-2014 $1,280,000; 2014-2015 $1,280,000 (total $5,530,000)

For

474

Against

608

For %

43.8%

Greenwood School District

Override · Clark

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2010-2011 $500,000; 2011-2012 $500,000; 2012-2013 $500,000; 2013-2014 $500,000; 2014-2015 $500,000; 2015-2016 $500,000 (total $3,000,000)

For

568

Against

396

For %

58.9%

Jefferson School District

Bond · Jefferson · $35.2M

Passed

Referendum to issue debt (general obligation bonds): public purpose of paying the cost of constructing and equipping additions to the high school including classrooms, cafeteria, office, gymnasium and pool; repairing, renovating and upgrading existing h...

For

1,816

Against

1,512

For %

54.6%

Johnson Creek School District

Bond · Jefferson · $17.7M

Failed

Referendum to issue debt (general obligation bonds): to build and equip a new junior/senior high school and make site improvements

For

613

Against

823

For %

42.7%

Johnson Creek School District

Bond · Jefferson · $2.4M

Failed

Referendum to issue debt (general obligation bonds): Constructing and equipping athletic facilities

For

541

Against

883

For %

38.0%

Lena School District

Override · Oconto, Marinette

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2010-2011 $300,000; 2011-2012 $400,000; 2012-2013 $400,000; 2013-2014 $450,000; 2014-2015 $450,000 (total $2,000,000)

For

451

Against

312

For %

59.1%

Markesan School District

Override · Green Lake, Columbia, Dodge, Fond du Lac, Marquette

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2010-2011 $1,400,000; 2011-2012 $1,400,000; 2012-2013 $1,400,000; 2013-2014 $1,400,000 (total $5,600,000)

For

1,103

Against

1,023

For %

51.9%

Norwalk-Ontario-Wilton School District

Bond · Monroe, Vernon · $5.8M

Passed

Referendum to issue debt (general obligation bonds): Construct, remodel and renovate existing building and acquire equipment, furnishings and fixtures

For

531

Against

370

For %

58.9%

Omro School District

Bond · Winnebago, Waushara · $1.2M

Failed

Referendum to issue debt (general obligation bonds): paying the cost of facilities and maintenance improvements

For

533

Against

565

For %

48.5%

Omro School District

Override · Winnebago, Waushara

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2010-2011 $250,000; 2011-2012 $250,000; 2012-2013 $250,000 (total $750,000)

For

465

Against

636

For %

42.2%

Pardeeville Area School District

Override · Columbia, Marquette

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2010-2011 $875,000; 2011-2012 $875,000 (total $1,750,000)

For

795

Against

436

For %

64.6%

Parkview School District

Bond · Rock · $2.8M

Failed

Referendum to issue debt (general obligation bonds): public purpose of paying the cost of immediate facility maintenance and energy conservation improvements

For

802

Against

876

For %

47.8%

Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.