Menu

Wisconsin · School bond & tax election

November 2015 Results

7 tracked measures in this cycle—5 passed and 2 failed (71% passage rate), totaling $29.0M in approved bonds.

Passed
5
Failed
2
Bond $ approved
$29.0M

Full results

7 tracked measures · 5 passed · 2 failed.

Showing 7 of 7

Boscobel Area School District

Bond · Grant, Crawford, Richland · $6.9M

Failed

Referendum to issue debt (general obligation bonds): To pay the cost of energy efficiency projects and upgrades to school buildings.

For

536

Against

567

For %

48.6%

Peshtigo School District

Bond · Marinette, Oconto · $33.0M

Failed

Referendum to issue debt (general obligation bonds): Construct a new middle-high school

For

797

Against

860

For %

48.1%

Potosi School District

Bond · Grant · $2.3M

Passed

Referendum to issue debt (general obligation bonds): Facility improvement and upgrades.

For

553

Against

105

For %

84.0%

Shawano School District

Bond · Shawano · $9.3M

Passed

Referendum to issue debt (general obligation bonds): MS Remodel Project

For

1,340

Against

717

For %

65.1%

Tigerton School District

Override · Shawano, Waupaca

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2015-2016 $283,509; 2016-2017 $444,258; 2017-2018 $473,250; 2018-2019 $525,426; 2019-2020 $554,509 (total $2,280,952)

For

484

Against

169

For %

74.1%

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2016-2017 $350,000; 2017-2018 $350,000; 2018-2019 $350,000; 2019-2020 $350,000; 2020-2021 $350,000 (total $1,750,000)

For

436

Against

148

For %

74.7%

Unity School District

Bond · Polk · $17.5M

Passed

Referendum to issue debt (general obligation bonds): Issue debt for the purpose of paying the cost of renovating and replacing mechanical and infrastructure in the school buildings; constructing science classrooms addition; remodeling and updating exist...

For

691

Against

550

For %

55.7%

Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.