Wisconsin county
Fond du Lac, Green Lake, Winnebago County
1 district has called 17 school bond and tax measures in this county—12 passed and 5 failed (71% passage rate), totaling $44.9M in approved bonds.
- Passed
- 12
- Failed
- 5
- Bond $ approved
- $44.9M
Full results
17 tracked measures · 12 passed · 5 failed.
Showing 17 of 17
Override · Fond du Lac, Green Lake, Winnebago · Nov 2022
Referendum to exceed revenue limit (non-recurring): non-recurring: 2022-2023 $850,000; 2023-2024 $850,000; 2024-2025 $850,000; 2025-2026 $850,000; 2026-2027 $850,000; 2027-2028 $850,000 (total $5,100,000)
For
2,766
Against
1,908
For %
59.2%
Override · Fond du Lac, Green Lake, Winnebago · Nov 2020
Referendum to exceed revenue limit (non-recurring): non-recurring: 2021-2022 $500,000; 2022-2023 $500,000; 2023-2024 $500,000; 2024-2025 $500,000; 2025-2026 $500,000; 2026-2027 $500,000 (total $3,000,000)
For
3,467
Against
2,155
For %
61.7%
Bond · Fond du Lac, Green Lake, Winnebago · Nov 2014 · $29.1M
Referendum to issue debt (general obligation bonds): Ripon School District will use $29,100,000 for the public purpose of paying the cost of constructing additions to, renovating and remodeling the high school to create a combined middle school and high...
For
2,812
Against
1,551
For %
64.5%
Override · Fond du Lac, Green Lake, Winnebago · Nov 2014
Referendum to exceed revenue limit (non-recurring): non-recurring: 2015-2016 $500,000; 2016-2017 $500,000; 2017-2018 $500,000; 2018-2019 $500,000; 2019-2020 $500,000; 2020-2021 $500,000 (total $3,000,000)
For
2,626
Against
1,691
For %
60.8%
Bond · Fond du Lac, Green Lake, Winnebago · Apr 2012 · $900K
Referendum to issue debt (general obligation bonds): paying the cost of acquiring parcels of real estate for a school site consisting of approximately 60 acres located on South Douglas Street approximately one-half mile north of the intersection with St...
For
919
Against
1,624
For %
36.1%
Bond · Fond du Lac, Green Lake, Winnebago · Apr 2009 · $500K
Referendum to issue debt (general obligation bonds): Replace the high school boiler and repair roofs at the middle school and the high school
For
1,372
Against
616
For %
69.0%
Override · Fond du Lac, Green Lake, Winnebago · Apr 2009
Referendum to exceed revenue limit (non-recurring): non-recurring: 2009-2010 $500,000; 2010-2011 $500,000; 2011-2012 $500,000; 2012-2013 $500,000; 2013-2014 $500,000; 2014-2015 $500,000 (total $3,000,000)
For
1,077
Against
898
For %
54.5%
Override · Fond du Lac, Green Lake, Winnebago · Apr 2009
Referendum to exceed revenue limit (non-recurring): non-recurring: 2009-2010 $575,000; 2010-2011 $725,000; 2011-2012 $850,000 (total $2,150,000)
For
854
Against
1,112
For %
43.4%
Bond · Fond du Lac, Green Lake, Winnebago · Sep 2006 · $925K
Referendum to issue debt (general obligation bonds): Replace and acquire fine arts equipment, technical education equipment, auditorium equipment and furnishings and replace the high school gymnasium floor.
For
1,817
Against
687
For %
72.6%
Bond · Fond du Lac, Green Lake, Winnebago · Sep 2006 · $750K
Referendum to issue debt (general obligation bonds): Paying the cost of installing artificial turf on Ingalls Field in partnership with Ripon College.
For
1,129
Against
1,357
For %
45.4%
Bond · Fond du Lac, Green Lake, Winnebago · Sep 2006 · $250K
Referendum to issue debt (general obligation bonds): Establish an endowment fund for future replacement of the playing surface at Ingalls Field.
For
1,248
Against
1,212
For %
50.7%
Bond · Fond du Lac, Green Lake, Winnebago · Apr 2006 · $1.5M
Referendum to issue debt (general obligation bonds): replace and equip fine arts equipment, music instruments and uniforms, auditorium equipment and stage curtains, improve school facilities including artificial turf
For
910
Against
910
For %
50.0%
Bond · Fond du Lac, Green Lake, Winnebago · Sep 2002 · $1.0M
Referendum to issue debt (general obligation bonds): hot water conversion and boiler replacement at MS, related asbestos abatement and professional fees
For
990
Against
355
For %
73.6%
Bond · Fond du Lac, Green Lake, Winnebago · Sep 1997 · $6.5M
Referendum to issue debt (general obligation bonds): Construct & Equip new elementary school
For
1,123
Against
980
For %
53.4%
Bond · Fond du Lac, Green Lake, Winnebago · Jan 1997 · $6.4M
Referendum to issue debt (general obligation bonds): new elementary school
For
957
Against
974
For %
49.6%
Bond · Fond du Lac, Green Lake, Winnebago · Jan 1997 · $4.6M
Referendum to issue debt (general obligation bonds): additions, remodeling & equipping high school
For
1,032
Against
899
For %
53.4%
Bond · Fond du Lac, Green Lake, Winnebago · Apr 1995 · $2.0M
Referendum to issue debt (general obligation bonds): remod & new caf, media cntr
For
1,182
Against
711
For %
62.4%
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.