Menu

Wisconsin · School bond & tax election

September 2006 Results

12 tracked measures in this cycle—6 passed and 6 failed (50% passage rate), totaling $20.2M in approved bonds.

Passed
6
Failed
6
Bond $ approved
$20.2M

Full results

12 tracked measures · 6 passed · 6 failed.

Showing 12 of 12

Antigo Unified School District

Override · Langlade, Marathon, Shawano

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $1,040,000; 2008-2009 $500,000; 2009-2010 $500,000; 2010-2011 $500,000 (total $2,540,000)

For

1,961

Against

2,274

For %

46.3%

Antigo Unified School District

Bond · Langlade, Marathon, Shawano · $21.5M

Failed

Referendum to issue debt (general obligation bonds): To Construct an Elementary Building

For

1,743

Against

2,525

For %

40.8%

Baraboo School District

Override · Sauk, Columbia

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2006-2007 $1,500,000; 2007-2008 $1,500,000; 2008-2009 $1,500,000; 2009-2010 $1,500,000; 2010-2011 $1,500,000 (total $7,500,000)

For

2,945

Against

3,077

For %

48.9%

Cumberland School District

Bond · Barron, Burnett, Polk · $3.4M

Failed

Referendum to issue debt (general obligation bonds): Paying the cost of constructing a new auditorium to serve the high school and middle school and acquiring equipment, furnishings and fixtures.

For

670

Against

844

For %

44.3%

Lake Geneva J1 School District

Bond · Walworth · $7.0M

Passed

Referendum to issue debt (general obligation bonds): building improvements projects, furnishings, fixtures, equipment

For

1,162

Against

617

For %

65.3%

Passed

Referendum to issue debt (general obligation bonds): construct addition to and replacement, remodeling, and improvement projects at Badger High School building and site; furnishings, fixtures and equipment

For

1,365

Against

993

For %

57.9%

Failed

Referendum to exceed revenue limit (recurring): recurring, phased: 2006-2007 +$250,000; 2007-2008 +$250,000; 2008-2009 +$250,000 (cumulative $750,000)

For

653

Against

1,064

For %

38.0%

Ripon Area School District

Bond · Fond du Lac, Green Lake, Winnebago · $750K

Failed

Referendum to issue debt (general obligation bonds): Paying the cost of installing artificial turf on Ingalls Field in partnership with Ripon College.

For

1,129

Against

1,357

For %

45.4%

Ripon Area School District

Bond · Fond du Lac, Green Lake, Winnebago · $925K

Passed

Referendum to issue debt (general obligation bonds): Replace and acquire fine arts equipment, technical education equipment, auditorium equipment and furnishings and replace the high school gymnasium floor.

For

1,817

Against

687

For %

72.6%

Ripon Area School District

Bond · Fond du Lac, Green Lake, Winnebago · $250K

Passed

Referendum to issue debt (general obligation bonds): Establish an endowment fund for future replacement of the playing surface at Ingalls Field.

For

1,248

Against

1,212

For %

50.7%

Shiocton School District

Override · Outagamie

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2006-2007 $123,500; 2007-2008 $291,260; 2008-2009 $441,051; 2009-2010 $625,868 (total $1,481,679)

For

523

Against

468

For %

52.8%

Unity School District

Override · Polk

Passed

Referendum to exceed revenue limit (recurring): $900,000 recurring

For

669

Against

573

For %

53.9%

Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.