Wisconsin · School bond & tax election
September 2006 Results
12 tracked measures in this cycle—6 passed and 6 failed (50% passage rate), totaling $20.2M in approved bonds.
- Passed
- 6
- Failed
- 6
- Bond $ approved
- $20.2M
Full results
12 tracked measures · 6 passed · 6 failed.
Showing 12 of 12
Antigo Unified School District
Override · Langlade, Marathon, Shawano
Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $1,040,000; 2008-2009 $500,000; 2009-2010 $500,000; 2010-2011 $500,000 (total $2,540,000)
For
1,961
Against
2,274
For %
46.3%
Antigo Unified School District
Bond · Langlade, Marathon, Shawano · $21.5M
Referendum to issue debt (general obligation bonds): To Construct an Elementary Building
For
1,743
Against
2,525
For %
40.8%
Override · Sauk, Columbia
Referendum to exceed revenue limit (non-recurring): non-recurring: 2006-2007 $1,500,000; 2007-2008 $1,500,000; 2008-2009 $1,500,000; 2009-2010 $1,500,000; 2010-2011 $1,500,000 (total $7,500,000)
For
2,945
Against
3,077
For %
48.9%
Bond · Barron, Burnett, Polk · $3.4M
Referendum to issue debt (general obligation bonds): Paying the cost of constructing a new auditorium to serve the high school and middle school and acquiring equipment, furnishings and fixtures.
For
670
Against
844
For %
44.3%
Lake Geneva J1 School District
Bond · Walworth · $7.0M
Referendum to issue debt (general obligation bonds): building improvements projects, furnishings, fixtures, equipment
For
1,162
Against
617
For %
65.3%
Lake Geneva-Genoa City UHS School District
Bond · Walworth · $12.0M
Referendum to issue debt (general obligation bonds): construct addition to and replacement, remodeling, and improvement projects at Badger High School building and site; furnishings, fixtures and equipment
For
1,365
Against
993
For %
57.9%
Override · Clark
Referendum to exceed revenue limit (recurring): recurring, phased: 2006-2007 +$250,000; 2007-2008 +$250,000; 2008-2009 +$250,000 (cumulative $750,000)
For
653
Against
1,064
For %
38.0%
Bond · Fond du Lac, Green Lake, Winnebago · $750K
Referendum to issue debt (general obligation bonds): Paying the cost of installing artificial turf on Ingalls Field in partnership with Ripon College.
For
1,129
Against
1,357
For %
45.4%
Bond · Fond du Lac, Green Lake, Winnebago · $925K
Referendum to issue debt (general obligation bonds): Replace and acquire fine arts equipment, technical education equipment, auditorium equipment and furnishings and replace the high school gymnasium floor.
For
1,817
Against
687
For %
72.6%
Bond · Fond du Lac, Green Lake, Winnebago · $250K
Referendum to issue debt (general obligation bonds): Establish an endowment fund for future replacement of the playing surface at Ingalls Field.
For
1,248
Against
1,212
For %
50.7%
Override · Outagamie
Referendum to exceed revenue limit (non-recurring): non-recurring: 2006-2007 $123,500; 2007-2008 $291,260; 2008-2009 $441,051; 2009-2010 $625,868 (total $1,481,679)
For
523
Against
468
For %
52.8%
Override · Polk
Referendum to exceed revenue limit (recurring): $900,000 recurring
For
669
Against
573
For %
53.9%
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.