Wisconsin · School bond & tax election
February 2003 Results
21 tracked measures in this cycle—4 passed and 17 failed (19% passage rate), totaling $23.7M in approved bonds.
- Passed
- 4
- Failed
- 17
- Bond $ approved
- $23.7M
Full results
21 tracked measures · 4 passed · 17 failed.
Showing 21 of 21
Bond · Chippewa, Dunn · $4.8M
Referendum to issue debt (general obligation bonds): remodel/renovate/upgrade and add classrooms to HS and acquire related equipment
For
439
Against
415
For %
51.4%
Bond · Barron, Burnett, Polk · $800K
Referendum to issue debt (general obligation bonds): update elementary school playground equipment including new equipment; acquire hockey building on school property, acquire land and construct parent drop off and parking lot adjacent to elementary sch...
For
251
Against
647
For %
27.9%
Bond · Oconto, Marinette · $3.0M
Referendum to issue debt (general obligation bonds): construct/equip addition to ES building and MS/HS building, thereby connecting 2 buildings; renovate/equip existing space at ES, MS, HS; perform major repairs and improvements at both buildings; bond ...
For
445
Against
233
For %
65.6%
Override · Marinette
Referendum to exceed revenue limit (non-recurring): non-recurring: 2003-2004 $75,000
For
228
Against
255
For %
47.2%
Palmyra-Eagle Area School District
Bond · Jefferson, Walworth, Waukesha · $15.9M
Referendum to issue debt (general obligation bonds): remodel/addition to HS to create a HS/MS facility; add art room, music room and 4 classrooms to Eagle ES, improvements to Palmyra ES
For
1,016
Against
915
For %
52.6%
Pardeeville Area School District
Bond · Columbia, Marquette · $11.9M
Referendum to issue debt (general obligation bonds): construct/equip new ES and remodel existing ES and HS
For
563
Against
966
For %
36.8%
Pardeeville Area School District
Bond · Columbia, Marquette · $1.0M
Referendum to issue debt (general obligation bonds): installation of air conditioning for lower level of existing ES and HS
For
531
Against
970
For %
35.4%
Pardeeville Area School District
Override · Columbia, Marquette
Referendum to exceed revenue limit (recurring): $311,000 recurring
For
518
Against
985
For %
34.5%
Bond · Marinette, Oconto · $3.9M
Referendum to issue debt (general obligation bonds): addition/renovation of elementary school; furnishings, fixtures, equipment
For
492
Against
910
For %
35.1%
Bond · Marinette, Oconto · $17.9M
Referendum to issue debt (general obligation bonds): purchase land; construct new grade 7-12 building including utility extensions and site improvements, equipment/furnishings/fixtures
For
364
Against
1,034
For %
26.0%
Bond · Marinette, Oconto · $2.7M
Referendum to issue debt (general obligation bonds): build new auditorium facility at new grade 7-12 building; acquire equipment, furnishings, fixtures
For
306
Against
1,077
For %
22.1%
Portage Community School District
Override · Columbia, Marquette, Sauk
Referendum to exceed revenue limit (non-recurring): non-recurring: 2003-2004 $1,500,000; 2004-2005 $1,500,000; 2005-2006 $1,500,000 (total $4,500,000)
For
1,539
Against
1,124
For %
57.8%
Override · Sauk, Juneau
Referendum to exceed revenue limit (recurring): $98,704 recurring
For
1,085
Against
1,759
For %
38.1%
Override · Sauk, Juneau
Referendum to exceed revenue limit (recurring): $495,000 recurring
For
932
Against
1,900
For %
32.9%
Override · Sauk, Juneau
Referendum to exceed revenue limit (recurring, one question): $275,000 recurring | $750,000 recurring | $275,000 recurring | $275,000 recurring
For
1,326
Against
1,508
For %
46.8%
Saint Croix Falls School District
Bond · Polk · $7.2M
Referendum to issue debt (general obligation bonds): construct/furnish/equip new ES; demolish present ES; interest costs during construction; architectural/engineering/bond issuance costs
For
847
Against
1,111
For %
43.3%
Bond · Crawford · $7.1M
Referendum to issue debt (general obligation bonds): acquire land, construct new PK school facility including site work, acquire equipment, furnishings, fixtures
For
341
Against
401
For %
46.0%
Bond · Washburn, Burnett · $19.4M
Referendum to issue debt (general obligation bonds): construct new HS facility, remodel/expand ES, acquire equipment
For
1,562
Against
1,957
For %
44.4%
Bond · Washburn, Burnett · $3.6M
Referendum to issue debt (general obligation bonds): construct/equip auditorium and football field at new HS facility
For
1,319
Against
2,165
For %
37.9%
Override · Washburn, Burnett
Referendum to exceed revenue limit (recurring): $467,500 recurring
For
1,439
Against
2,057
For %
41.2%
Waunakee Community School District
Bond · Dane · $37.0M
Referendum to issue debt (general obligation bonds): construct new HS facility for grades 9-12; remodel existing HS and convert to grades 7-8; convert existing MS to grades 5-6 school; convert existing intermediate school to grades k-4; acquistion of eq...
For
2,138
Against
3,332
For %
39.1%
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.