Menu

Wisconsin · Polk County

Saint Croix Falls School District

Voters have decided 12 school bond and tax measures here—5 passed and 7 failed (42% passage rate), totaling $41.1M in approved bonds.

Compare with other districts
Passed
5
Failed
7
Bond $ approved
$41.1M

Full results

12 tracked measures · 5 passed · 7 failed.

Showing 12 of 12

Bond · Polk · Apr 2020 · $14.0M

Passed

Referendum to issue debt (general obligation bonds): To pay for the cost of a school building and improvement program, consisting of constructing new, as well as remodeling and capital improvements of existing facilities.

For

1,087

Against

924

For %

54.0%

Bond · Polk · Apr 2017 · $5.2M

Passed

Referendum to issue debt (general obligation bonds): To pay for the cost of school improvement and maintenance program at District facilities and grounds

For

829

Against

361

For %

69.7%

Override · Polk · Apr 2015

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2015-2016 $240,000; 2016-2017 $240,000; 2017-2018 $240,000; 2018-2019 $240,000; 2019-2020 $240,000 (total $1,200,000)

For

401

Against

509

For %

44.1%

Override · Polk · Apr 2014

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2014-2015 $240,000; 2015-2016 $240,000; 2016-2017 $240,000; 2017-2018 $240,000; 2018-2019 $240,000 (total $1,200,000)

For

329

Against

399

For %

45.2%

Bond · Polk · Apr 2006 · $9.8M

Passed

Referendum to issue debt (general obligation bonds): to remodel and construct new addition to elementary school

For

1,199

Against

803

For %

59.9%

Bond · Polk · Feb 2003 · $7.2M

Failed

Referendum to issue debt (general obligation bonds): construct/furnish/equip new ES; demolish present ES; interest costs during construction; architectural/engineering/bond issuance costs

For

847

Against

1,111

For %

43.3%

Bond · Polk · Nov 2002 · $999K

Failed

Referendum to issue debt (general obligation bonds): remodel existing space and construct addition to High School, furnishings/equipment, construction period interest, architect/engineering/bond issuance costs

For

1,157

Against

1,342

For %

46.3%

Bond · Polk · Nov 2002 · $1.9M

Failed

Referendum to issue debt (general obligation bonds): construct, furnish, equip auditorium at High School, construction period interest, architect/engineering/bond issuance costs

For

1,004

Against

1,491

For %

40.2%

Bond · Polk · Nov 2002 · $7.2M

Failed

Referendum to issue debt (general obligation bonds): construct, furnish, equip new elementary school building, construction period interest costs, architect/engineering/bond issuance costs

For

1,254

Against

1,257

For %

49.9%

Bond · Polk · Oct 1996 · $7.6M

Passed

Referendum to issue debt (general obligation bonds): construct and equip new high school

For

669

Against

339

For %

66.4%

Bond · Polk · Dec 1994 · $4.5M

Passed

Referendum to issue debt (general obligation bonds): new ms attached to present hs

For

798

Against

588

For %

57.6%

Bond · Polk · Apr 1993 · $5.2M

Failed

Referendum to issue debt (general obligation bonds)

For

458

Against

1,126

For %

28.9%

Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.