Wisconsin · Dodge County
Horicon School District
Voters have decided 11 school bond and tax measures here—5 passed and 6 failed (45% passage rate), totaling $39.4M in approved bonds.
Compare with other districts- Passed
- 5
- Failed
- 6
- Bond $ approved
- $39.4M
Full results
11 tracked measures · 5 passed · 6 failed.
Showing 11 of 11
Override · Dodge · Apr 2023
Referendum to exceed revenue limit (non-recurring): non-recurring: 2023-2024 $800,000; 2024-2025 $800,000; 2025-2026 $800,000; 2026-2027 $800,000; 2027-2028 $800,000 (total $4,000,000)
For
798
Against
1,107
For %
41.9%
Bond · Dodge · Apr 2018 · $22.9M
Referendum to issue debt (general obligation bonds): The construction of a new elementary school; Junior/Senior High School site renovations including safety and security upgrades; and the creation of a consolidated campus.
For
1,031
Against
653
For %
61.2%
Bond · Dodge · Apr 2018 · $3.6M
Referendum to issue debt (general obligation bonds): Junior/Senior High School building infrastructure which includes; roofs, plumbing, HVAC, electrical updates, corridor upgrade.
For
1,039
Against
620
For %
62.6%
Bond · Dodge · Nov 2012 · $2.9M
Referendum to issue debt (general obligation bonds): To construct a High School addition and equipment for the technology education program, remodeling high school for classroom space, facility maintenance, security remodeling and technology upgrades.
For
1,910
Against
1,269
For %
60.1%
Override · Dodge · Apr 2009
Referendum to exceed revenue limit (non-recurring): non-recurring $300,000
For
505
Against
822
For %
38.1%
Override · Dodge · Apr 2007
Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $400,000; 2008-2009 $350,000; 2009-2010 $350,000; 2010-2011 $350,000; 2011-2012 $350,000 (total $1,800,000)
For
683
Against
873
For %
43.9%
Bond · Dodge · Apr 2004 · $1.9M
Referendum to issue debt (general obligation bonds): construct and equip a new High School gymnasium
For
643
Against
1,022
For %
38.6%
Bond · Dodge · Nov 2003 · $1.9M
Referendum to issue debt (general obligation bonds): construct/equip new High School gymnasium
For
520
Against
561
For %
48.1%
Bond · Dodge · Nov 2003 · $4.6M
Referendum to issue debt (general obligation bonds): various improvements at High School and Elementary/Middle School buildings including roof replacements; replace gym floor and bleachers and upgrades to electrical/plumbing/HVAC and refund a lease/purc...
For
765
Against
329
For %
69.9%
Override · Dodge · Feb 1999
Referendum to exceed revenue limit (recurring): $550,000 recurring
For
331
Against
705
For %
31.9%
Bond · Dodge · Mar 1992 · $5.5M
Referendum to issue debt (general obligation bonds)
For
643
Against
486
For %
57.0%
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.