Wisconsin · School bond & tax election
April 2007 Results
72 tracked measures in this cycle—35 passed and 37 failed (49% passage rate), totaling $194M in approved bonds.
- Passed
- 35
- Failed
- 37
- Bond $ approved
- $194M
Full results
72 tracked measures · 35 passed · 37 failed.
Showing 25 of 72
Override · Jackson, Clark
Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $380,000; 2008-2009 $380,000; 2009-2010 $380,000; 2010-2011 $380,000 (total $1,520,000)
For
261
Against
421
For %
38.3%
Bond · Eau Claire, Polk, St. Croix · $2.0M
Referendum to issue debt (general obligation bonds): building and grounds maintenance projects
For
1,411
Against
1,022
For %
58.0%
Override · Eau Claire, Polk, St. Croix
Referendum to exceed revenue limit (recurring): $1,000,000 recurring
For
1,236
Against
1,229
For %
50.1%
Antigo Unified School District
Override · Langlade, Marathon, Shawano
Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $1,200,000; 2008-2009 $1,400,000; 2009-2010 $1,800,000 (total $4,400,000)
For
1,810
Against
2,399
For %
43.0%
Bond · Barron, Dunn · $3.1M
Referendum to issue debt (general obligation bonds): Paying the cost of various construction, acquisition and installation costs connected to modifying the District's climate control systems, including installing a wood boiler system at Riverview Middle...
For
815
Against
726
For %
52.9%
Override · Barron, Dunn
Referendum to exceed revenue limit (recurring): $790,000 recurring
For
708
Against
828
For %
46.1%
Override · Lafayette, Green
Referendum to exceed revenue limit (recurring): recurring, phased: 2007-2008 +$500,000; 2008-2009 +$245,000; 2009-2010 +$105,000 (cumulative $850,000)
For
487
Against
516
For %
48.5%
Override · Shawano
Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $150,000; 2008-2009 $150,000; 2009-2010 $150,000; 2010-2011 $150,000; 2011-2012 $150,000; 2012-2013 $150,000 (total $900,000)
For
793
Against
692
For %
53.4%
Bond · Milwaukee · $4.1M
Referendum to issue debt (general obligation bonds): High School Renovation
For
1,602
Against
810
For %
66.4%
Bond · Waupaca, Outagamie, Shawano · $10.7M
Referendum to issue debt (general obligation bonds): building improvments including HVAC upgrades and maintenance projects
For
615
Against
1,148
For %
34.9%
Override · Waupaca, Outagamie, Shawano
Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $425,000; 2008-2009 $590,000; 2009-2010 $655,000; 2010-2011 $655,000; 2011-2012 $655,000 (total $2,980,000)
For
561
Against
1,185
For %
32.1%
Eau Claire Area School District
Override · Eau Claire, Chippewa, Dunn
Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $5,442,081; 2008-2009 $7,427,716; 2009-2010 $8,732,134 (total $21,601,931)
For
6,570
Against
8,385
For %
43.9%
Elkhart Lake-Glenbeulah School District
Override · Sheboygan
Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $210,000; 2008-2009 $210,000; 2009-2010 $210,000; 2010-2011 $210,000; 2011-2012 $210,000 (total $1,050,000)
For
602
Against
374
For %
61.7%
Bond · Walworth · $240K
Referendum to issue debt (general obligation bonds): install sprinkler system at district administrative offices in the 1887 building
For
1,526
Against
1,153
For %
57.0%
Bond · Walworth · $5.0M
Referendum to issue debt (general obligation bonds): school building program
For
1,509
Against
1,192
For %
55.9%
Bond · Waukesha · $9.5M
Referendum to issue debt (general obligation bonds): To borrow $9,500,000 for the purpose of adding a field house to both Brookfield Central High School and Brookfield East High School
For
6,980
Against
11,058
For %
38.7%
Bond · Waukesha · $99.3M
Referendum to issue debt (general obligation bonds): Seek Approval to Borrow $99,300,000 for remodeling and adding onto Brookfield East and Brookfield Central High Schools
For
6,435
Against
11,415
For %
36.0%
Override · Pierce
Referendum to exceed revenue limit (recurring): recurring, phased: 2007-2008 +$300,000; 2008-2009 +$300,000; 2009-2010 +$300,000 (cumulative $900,000)
For
405
Against
279
For %
59.2%
Franklin Public School District
Bond · Milwaukee · $77.0M
Referendum to issue debt (general obligation bonds): purchase land, construct new high school, remodel/renovate existing high school for use as middle school, equipment, furnishings and equipment
For
2,495
Against
3,811
For %
39.6%
Franklin Public School District
Override · Milwaukee
Referendum to exceed revenue limit (recurring): $1,180,000 recurring
For
2,365
Against
3,851
For %
38.0%
Bond · Outagamie · $465K
Referendum to issue debt (general obligation bonds): Acquire a parcel of real estate for school sites.
For
438
Against
1,560
For %
21.9%
Bond · Walworth · $5.1M
Referendum to issue debt (general obligation bonds): Elementary School Renovation and additional classroom space at the middle school
For
208
Against
243
For %
46.1%
Gibraltar Area School District
Bond · Door · $4.0M
Referendum to issue debt (general obligation bonds): Paying cost of repairing, renovating, remodeling, and improving the school building and grounds; installing, replacing, and/or upgrading electrical, hot water, HVAC, fire alarms, and security systems;...
For
1,347
Against
649
For %
67.5%
Override · ASHLAND
Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $150,000; 2008-2009 $250,000; 2009-2010 $350,000 (total $750,000)
For
363
Against
271
For %
57.3%
Bond · Milwaukee · $14.7M
Referendum to issue debt (general obligation bonds): renovations and improvements to existing school facilities; repair and replace windows, HVAC and other furnishings, fixtures and equipment, site improvements
For
2,696
Against
2,330
For %
53.6%
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.