Menu

Wisconsin · School bond & tax election

April 2007 Results

72 tracked measures in this cycle—35 passed and 37 failed (49% passage rate), totaling $194M in approved bonds.

Passed
35
Failed
37
Bond $ approved
$194M

Full results

72 tracked measures · 35 passed · 37 failed.

Showing 25 of 72

Alma Center School District

Override · Jackson, Clark

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $380,000; 2008-2009 $380,000; 2009-2010 $380,000; 2010-2011 $380,000 (total $1,520,000)

For

261

Against

421

For %

38.3%

Amery School District

Bond · Eau Claire, Polk, St. Croix · $2.0M

Passed

Referendum to issue debt (general obligation bonds): building and grounds maintenance projects

For

1,411

Against

1,022

For %

58.0%

Amery School District

Override · Eau Claire, Polk, St. Croix

Passed

Referendum to exceed revenue limit (recurring): $1,000,000 recurring

For

1,236

Against

1,229

For %

50.1%

Antigo Unified School District

Override · Langlade, Marathon, Shawano

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $1,200,000; 2008-2009 $1,400,000; 2009-2010 $1,800,000 (total $4,400,000)

For

1,810

Against

2,399

For %

43.0%

Barron Area School District

Bond · Barron, Dunn · $3.1M

Passed

Referendum to issue debt (general obligation bonds): Paying the cost of various construction, acquisition and installation costs connected to modifying the District's climate control systems, including installing a wood boiler system at Riverview Middle...

For

815

Against

726

For %

52.9%

Barron Area School District

Override · Barron, Dunn

Failed

Referendum to exceed revenue limit (recurring): $790,000 recurring

For

708

Against

828

For %

46.1%

Black Hawk School District

Override · Lafayette, Green

Failed

Referendum to exceed revenue limit (recurring): recurring, phased: 2007-2008 +$500,000; 2008-2009 +$245,000; 2009-2010 +$105,000 (cumulative $850,000)

For

487

Against

516

For %

48.5%

Bonduel School District

Override · Shawano

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $150,000; 2008-2009 $150,000; 2009-2010 $150,000; 2010-2011 $150,000; 2011-2012 $150,000; 2012-2013 $150,000 (total $900,000)

For

793

Against

692

For %

53.4%

Brown Deer School District

Bond · Milwaukee · $4.1M

Passed

Referendum to issue debt (general obligation bonds): High School Renovation

For

1,602

Against

810

For %

66.4%

Clintonville School District

Bond · Waupaca, Outagamie, Shawano · $10.7M

Failed

Referendum to issue debt (general obligation bonds): building improvments including HVAC upgrades and maintenance projects

For

615

Against

1,148

For %

34.9%

Clintonville School District

Override · Waupaca, Outagamie, Shawano

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $425,000; 2008-2009 $590,000; 2009-2010 $655,000; 2010-2011 $655,000; 2011-2012 $655,000 (total $2,980,000)

For

561

Against

1,185

For %

32.1%

Eau Claire Area School District

Override · Eau Claire, Chippewa, Dunn

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $5,442,081; 2008-2009 $7,427,716; 2009-2010 $8,732,134 (total $21,601,931)

For

6,570

Against

8,385

For %

43.9%

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $210,000; 2008-2009 $210,000; 2009-2010 $210,000; 2010-2011 $210,000; 2011-2012 $210,000 (total $1,050,000)

For

602

Against

374

For %

61.7%

Elkhorn Area School District

Bond · Walworth · $240K

Passed

Referendum to issue debt (general obligation bonds): install sprinkler system at district administrative offices in the 1887 building

For

1,526

Against

1,153

For %

57.0%

Elkhorn Area School District

Bond · Walworth · $5.0M

Passed

Referendum to issue debt (general obligation bonds): school building program

For

1,509

Against

1,192

For %

55.9%

Elmbrook School District

Bond · Waukesha · $9.5M

Failed

Referendum to issue debt (general obligation bonds): To borrow $9,500,000 for the purpose of adding a field house to both Brookfield Central High School and Brookfield East High School

For

6,980

Against

11,058

For %

38.7%

Elmbrook School District

Bond · Waukesha · $99.3M

Failed

Referendum to issue debt (general obligation bonds): Seek Approval to Borrow $99,300,000 for remodeling and adding onto Brookfield East and Brookfield Central High Schools

For

6,435

Against

11,415

For %

36.0%

Elmwood School District

Override · Pierce

Passed

Referendum to exceed revenue limit (recurring): recurring, phased: 2007-2008 +$300,000; 2008-2009 +$300,000; 2009-2010 +$300,000 (cumulative $900,000)

For

405

Against

279

For %

59.2%

Franklin Public School District

Bond · Milwaukee · $77.0M

Failed

Referendum to issue debt (general obligation bonds): purchase land, construct new high school, remodel/renovate existing high school for use as middle school, equipment, furnishings and equipment

For

2,495

Against

3,811

For %

39.6%

Franklin Public School District

Override · Milwaukee

Failed

Referendum to exceed revenue limit (recurring): $1,180,000 recurring

For

2,365

Against

3,851

For %

38.0%

Freedom Area School District

Bond · Outagamie · $465K

Failed

Referendum to issue debt (general obligation bonds): Acquire a parcel of real estate for school sites.

For

438

Against

1,560

For %

21.9%

Genoa City J2 School District

Bond · Walworth · $5.1M

Failed

Referendum to issue debt (general obligation bonds): Elementary School Renovation and additional classroom space at the middle school

For

208

Against

243

For %

46.1%

Gibraltar Area School District

Bond · Door · $4.0M

Passed

Referendum to issue debt (general obligation bonds): Paying cost of repairing, renovating, remodeling, and improving the school building and grounds; installing, replacing, and/or upgrading electrical, hot water, HVAC, fire alarms, and security systems;...

For

1,347

Against

649

For %

67.5%

Glidden

Override · ASHLAND

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $150,000; 2008-2009 $250,000; 2009-2010 $350,000 (total $750,000)

For

363

Against

271

For %

57.3%

Greendale School District

Bond · Milwaukee · $14.7M

Passed

Referendum to issue debt (general obligation bonds): renovations and improvements to existing school facilities; repair and replace windows, HVAC and other furnishings, fixtures and equipment, site improvements

For

2,696

Against

2,330

For %

53.6%

Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.