Menu

Wisconsin county

Winnebago County

2 districts have called 19 school bond and tax measures in this county—14 passed and 5 failed (74% passage rate), totaling $494M in approved bonds.

Passed
14
Failed
5
Bond $ approved
$494M

Full results

19 tracked measures · 14 passed · 5 failed.

Showing 19 of 19

Oshkosh Area School District

Bond · Winnebago · Apr 2025 · $198M

Passed

Referendum to issue debt (general obligation bonds): INITIAL RESOLUTION AUTHORIZING GENERAL OBLIGATION BONDS IN AN AMOUNT NOT TO EXCEED $197,800,000 Said Initial Resolution was adopted pursuant to the provisions of Chapter 67 of the Wisconsin Statutes t...

For

13,958

Against

13,487

For %

50.9%

Oshkosh Area School District

Bond · Winnebago · Nov 2020 · $107M

Passed

Referendum to issue debt (general obligation bonds): Issue Debt for 107,000,000.00 to construct two new schools and complete safety and infrastructure updates to many buildings.

For

21,985

Against

16,832

For %

56.6%

Oshkosh Area School District

Override · Winnebago · Nov 2020

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2021-2022 $3,950,000; 2022-2023 $3,950,000; 2023-2024 $7,950,000; 2024-2025 $7,950,000; 2025-2026 $7,950,000; 2026-2027 $7,950,000; 2027-2028 $7,950,000; 2028-2029 $7,950,000; 2029-2030 $7,950,000 (total $63,550,000)

For

22,242

Against

16,680

For %

57.1%

Neenah Joint School District

Bond · Winnebago · Apr 2020 · $115M

Passed

Referendum to issue debt (general obligation bonds): Construct a new high school, district-wide safety and security, renovating the existing high school to convert it into an intermediate school and a middle school.

For

8,817

Against

7,456

For %

54.2%

Neenah Joint School District

Bond · Winnebago · Apr 2019 · $130M

Failed

Referendum to issue debt (general obligation bonds): Safety and security upgrades at all district facilities, construct a new middle school, high school tech ed renovation, ADA and infrastructure upgrades.

For

6,156

Against

6,654

For %

48.1%

Oshkosh Area School District

Override · Winnebago · Apr 2016

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2016-2017 $4,000,000; 2017-2018 $4,000,000; 2018-2019 $4,000,000; 2019-2020 $4,000,000; 2020-2021 $4,000,000; 2021-2022 $4,000,000; 2022-2023 $4,000,000 (total $28,000,000)

For

17,078

Against

11,658

For %

59.4%

Oshkosh Area School District

Override · Winnebago · Apr 2014

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2014-2015 $3,950,000; 2015-2016 $3,950,000; 2016-2017 $3,950,000; 2017-2018 $3,950,000; 2018-2019 $3,950,000; 2019-2020 $3,950,000; 2020-2021 $3,950,000 (total $27,650,000)

For

7,325

Against

5,006

For %

59.4%

Oshkosh Area School District

Bond · Winnebago · Apr 2012 · $13.0M

Passed

Referendum to issue debt (general obligation bonds): paying the cost of constructing and equipping a new elementary school to replace the existing Oaklawn Elementary School to be located at the existing school site

For

12,492

Against

5,639

For %

68.9%

Oshkosh Area School District

Bond · Winnebago · Apr 2009 · $15.0M

Failed

Referendum to issue debt (general obligation bonds): construct and equip a new elementary school

For

3,777

Against

10,165

For %

27.1%

Oshkosh Area School District

Override · Winnebago · Apr 2009

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2009-2010 $500,000; 2010-2011 $500,000; 2011-2012 $500,000; 2012-2013 $500,000; 2013-2014 $500,000 (total $2,500,000)

For

6,902

Against

6,957

For %

49.8%

Oshkosh Area School District

Override · Winnebago · Apr 2009

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2009-2010 $1,300,000; 2010-2011 $1,300,000; 2011-2012 $1,300,000; 2012-2013 $1,300,000; 2013-2014 $1,300,000 (total $6,500,000)

For

7,246

Against

6,647

For %

52.2%

Neenah Joint School District

Override · Winnebago · Nov 2006

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $2,600,000; 2008-2009 $2,200,000; 2009-2010 $1,200,000 (total $6,000,000)

For

8,847

Against

8,299

For %

51.6%

Oshkosh Area School District

Bond · Winnebago · Nov 2001 · $12.9M

Failed

Referendum to issue debt (general obligation bonds): construct/equip new Sunset Elem School; addition to Lakeside, Oaklawn, Oakwood and Washington Elem Schools and acquisition of land related to said additions

For

3,438

Against

8,053

For %

29.9%

Oshkosh Area School District

Override · Winnebago · Nov 2001

Failed

Referendum to exceed revenue limit (recurring): recurring, phased: 2003-2004 +$350,000; 2004-2005 +$350,000; 2005-2006 +$350,000; 2006-2007 +$350,000; 2007-2008 +$350,000; 2008-2009 +$350,000 (cumulative $2,100,000)

For

3,039

Against

8,401

For %

26.6%

Oshkosh Area School District

Bond · Winnebago · Nov 1998 · $5.3M

Passed

Referendum to issue debt (general obligation bonds): new elementary school

For

16,467

Against

6,556

For %

71.5%

Oshkosh Area School District

Bond · Winnebago · Nov 1998 · $8.5M

Passed

Referendum to issue debt (general obligation bonds): add to & remodel middle school; technol. infrastructure

For

13,234

Against

9,630

For %

57.9%

Neenah Joint School District

Bond · Winnebago · Nov 1996 · $6.9M

Passed

Referendum to issue debt (general obligation bonds): prior service costs

For

10,361

Against

4,318

For %

70.6%

Oshkosh Area School District

Bond · Winnebago · Nov 1995 · $25.9M

Passed

Referendum to issue debt (general obligation bonds): 550 stud elem, separate 600 stud ms

For

6,826

Against

5,418

For %

55.8%

Neenah Joint School District

Bond · Winnebago · Feb 1995 · $15.0M

Passed

Referendum to issue debt (general obligation bonds): hs add renov & ADA imprvmnts,ADA imprvmnts at ms & elem

For

3,510

Against

1,671

For %

67.8%

Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.

Winnebago County, Wisconsin — School Election History | PBK Elections Data Archive