Wisconsin county
Iron County
2 districts have called 14 school bond and tax measures in this county—7 passed and 7 failed (50% passage rate), totaling $2.6M in approved bonds.
- Passed
- 7
- Failed
- 7
- Bond $ approved
- $2.6M
Full results
14 tracked measures · 7 passed · 7 failed.
Showing 14 of 14
Override · Iron · Apr 2024
Referendum to exceed revenue limit (non-recurring): non-recurring: 2024-2025 $800,000; 2025-2026 $800,000; 2026-2027 $800,000; 2027-2028 $800,000; 2028-2029 $800,000 (total $4,000,000)
For
455
Against
286
For %
61.4%
Override · Iron · Apr 2023
Referendum to exceed revenue limit (non-recurring): non-recurring: 2023-2024 $745,000; 2024-2025 $745,000; 2025-2026 $745,000 (total $2,235,000)
For
365
Against
393
For %
48.1%
Override · Iron · Feb 2013
Referendum to exceed revenue limit (recurring): $650,000 recurring
For
430
Against
230
For %
65.2%
Override · Iron · Nov 2008
Referendum to exceed revenue limit (non-recurring): non-recurring: 2009-2010 $350,000; 2010-2011 $350,000; 2011-2012 $350,000; 2012-2013 $350,000; 2013-2014 $350,000 (total $1,750,000)
For
710
Against
302
For %
70.2%
Override · Iron · Apr 2006
Referendum to exceed revenue limit (non-recurring): non-recurring: 2006-2007 $250,000; 2007-2008 $250,000; 2008-2009 $250,000 (total $750,000)
For
596
Against
182
For %
76.6%
Bond · Iron · Jun 2005 · $2.3M
Referendum to issue debt (general obligation bonds): roof replacement project
For
749
Against
306
For %
71.0%
Override · Iron · Nov 2004
Referendum to exceed revenue limit (recurring): $50,000 recurring
For
868
Against
1,620
For %
34.9%
Bond · Iron · Nov 2004 · $2.4M
Referendum to issue debt (general obligation bonds): replace roof, structural repairs, maintenance and repairs
For
1,008
Against
1,520
For %
39.9%
Override · Iron · Nov 2002
Referendum to exceed revenue limit (non-recurring): non-recurring: 2003-2004 $140,000; 2004-2005 $140,000; 2005-2006 $140,000 (total $420,000)
For
501
Against
315
For %
61.4%
Bond · Iron · Apr 2002 · $300K
Referendum to issue debt (general obligation bonds): replace existing boiler heating plant at K-12 building with an energy efficient unit and replacement of steam heating portion with the hot water system along with asbestos removal from piping and rela...
For
264
Against
179
For %
59.6%
Override · Iron · Apr 2002
Referendum to exceed revenue limit (non-recurring): non-recurring: 2002-2003 $125,000; 2003-2004 $125,000; 2004-2005 $125,000; 2005-2006 $125,000; 2006-2007 $125,000 (total $625,000)
For
172
Against
258
For %
40.0%
Override · Iron · Dec 1997
Referendum to exceed revenue limit (recurring): $250,000 recurring
For
828
Against
1,171
For %
41.4%
Override · Iron · Oct 1997
Referendum to exceed revenue limit (recurring): $250,000 recurring
For
735
Against
892
For %
45.2%
Bond · Iron · Apr 1997 · $2.8M
Referendum to issue debt (general obligation bonds)
For
—
Against
—
For %
—
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.