Wisconsin · School bond & tax election
September 2000 Results
25 tracked measures in this cycle—12 passed and 13 failed (48% passage rate), totaling $45.8M in approved bonds.
- Passed
- 12
- Failed
- 13
- Bond $ approved
- $45.8M
Full results
25 tracked measures · 12 passed · 13 failed.
Showing 25 of 25
Bond · Bayfield · $6.0M
Referendum to issue debt (general obligation bonds): remodel, add to, renovate and equip existing school facilities(partially SAGE)
For
451
Against
347
For %
56.5%
Bond · Lafayette, Grant · $4.0M
Referendum to issue debt (general obligation bonds): addition to and remodeling of HS ; acquire equipment
For
479
Against
475
For %
50.2%
Bond · Polk, Barron, Dunn, St. Croix · $2.5M
Referendum to issue debt (general obligation bonds): construct/equip addition and athletic fields (partially SAGE)
For
290
Against
348
For %
45.5%
Override · Polk, Barron, Dunn, St. Croix
Referendum to exceed revenue limit (non-recurring): non-recurring: 2000-2001 $100,000; 2001-2002 $150,000; 2002-2003 $200,000 (total $450,000)
For
249
Against
378
For %
39.7%
Bond · Waupaca, Outagamie, Shawano · $22.9M
Referendum to issue debt (general obligation bonds): construct/equip new H.S.; remodel HS/elem school/MS complex; relocate central office;acquire 49 acres of land
For
2,236
Against
980
For %
69.5%
Override · Waupaca, Outagamie, Shawano
Referendum to exceed revenue limit (recurring): $650,000 recurring
For
2,065
Against
1,067
For %
65.9%
Override · Vernon, Crawford
Referendum to exceed revenue limit (non-recurring): non-recurring: 2000-2001 $280,000
For
535
Against
437
For %
55.0%
Deerfield Community School District
Bond · Dane · $12.8M
Referendum to issue debt (general obligation bonds): construct new PK-6 school; repairs to MS, HS; related cost for architect/engineer/bond counsel
For
478
Against
586
For %
44.9%
Elkhart Lake-Glenbeulah School District
Override · Sheboygan
Referendum to exceed revenue limit (non-recurring): non-recurring: 2000-2001 $302,000; 2001-2002 $302,000 (total $604,000)
For
585
Against
533
For %
52.3%
Ellsworth Community School District
Override · Pierce
Referendum to exceed revenue limit (recurring): $500,000 recurring
For
1,164
Against
1,359
For %
46.1%
Bond · Outagamie · $12.8M
Referendum to issue debt (general obligation bonds): capital improvements
For
681
Against
957
For %
41.6%
Override · Outagamie
Referendum to exceed revenue limit (recurring): $325,000 recurring
For
746
Against
894
For %
45.5%
Gibraltar Area School District
Override · Door
Referendum to exceed revenue limit (non-recurring): non-recurring: 2001-2002 $650,000; 2002-2003 $775,000 (total $1,425,000)
For
956
Against
806
For %
54.3%
Lake Geneva J1 School District
Bond · Walworth · $3.0M
Referendum to issue debt (general obligation bonds): additition to Star Center
For
964
Against
412
For %
70.1%
Lake Geneva J1 School District
Override · Walworth
Referendum to exceed revenue limit (recurring): $300,000 recurring
For
840
Against
495
For %
62.9%
Bond · Marathon · $8.0M
Referendum to issue debt (general obligation bonds): construct/equip new K-1 elementary school; remodel,improve, construct addition Mosinee Elem school
For
1,194
Against
1,420
For %
45.7%
Override · Marathon
Referendum to exceed revenue limit (recurring): $525,000 recurring
For
1,043
Against
1,418
For %
42.4%
Bond · Price · $2.6M
Referendum to issue debt (general obligation bonds): addition to HS and remodel/improvements to HS; equip acquisition
For
896
Against
919
For %
49.4%
Override · Price
Referendum to exceed revenue limit (recurring): $150,000 recurring
For
807
Against
976
For %
45.3%
Override · Columbia, Dane
Referendum to exceed revenue limit (recurring): $200,000 recurring
For
535
Against
493
For %
52.0%
Bond · Pierce · $13.6M
Referendum to issue debt (general obligation bonds): purchase property; construct new MS; construct addition to and remodel Malone elementary
For
731
Against
879
For %
45.4%
Bond · Juneau, Monroe, Vernon · $9.1M
Referendum to issue debt (general obligation bonds): building/remodeling HS, MS, elem school
For
398
Against
1,016
For %
28.1%
Stevens Point Area Public School District
Override · Portage, Wood
Referendum to exceed revenue limit (non-recurring): non-recurring: 2000-2001 $1,350,000; 2001-2002 $1,350,000 (total $2,700,000)
For
7,655
Against
3,345
For %
69.6%
Bond · Barron, Polk · $3.9M
Referendum to issue debt (general obligation bonds): remodel/renovating and construct addition to HS and elem school/furnishings, furniture and equipment
For
368
Against
414
For %
47.1%
Bond · Burnett, Douglas · $9.9M
Referendum to issue debt (general obligation bonds): build a grade 5-12 school facility; site work; acquire equip, furnishings, fixtures
For
1,372
Against
793
For %
63.4%
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.