Menu

Wisconsin · School bond & tax election

September 2000 Results

25 tracked measures in this cycle—12 passed and 13 failed (48% passage rate), totaling $45.8M in approved bonds.

Passed
12
Failed
13
Bond $ approved
$45.8M

Full results

25 tracked measures · 12 passed · 13 failed.

Showing 25 of 25

Bayfield School District

Bond · Bayfield · $6.0M

Passed

Referendum to issue debt (general obligation bonds): remodel, add to, renovate and equip existing school facilities(partially SAGE)

For

451

Against

347

For %

56.5%

Benton School District

Bond · Lafayette, Grant · $4.0M

Passed

Referendum to issue debt (general obligation bonds): addition to and remodeling of HS ; acquire equipment

For

479

Against

475

For %

50.2%

Clear Lake School District

Bond · Polk, Barron, Dunn, St. Croix · $2.5M

Failed

Referendum to issue debt (general obligation bonds): construct/equip addition and athletic fields (partially SAGE)

For

290

Against

348

For %

45.5%

Clear Lake School District

Override · Polk, Barron, Dunn, St. Croix

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2000-2001 $100,000; 2001-2002 $150,000; 2002-2003 $200,000 (total $450,000)

For

249

Against

378

For %

39.7%

Clintonville School District

Bond · Waupaca, Outagamie, Shawano · $22.9M

Passed

Referendum to issue debt (general obligation bonds): construct/equip new H.S.; remodel HS/elem school/MS complex; relocate central office;acquire 49 acres of land

For

2,236

Against

980

For %

69.5%

Clintonville School District

Override · Waupaca, Outagamie, Shawano

Passed

Referendum to exceed revenue limit (recurring): $650,000 recurring

For

2,065

Against

1,067

For %

65.9%

De Soto Area School District

Override · Vernon, Crawford

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2000-2001 $280,000

For

535

Against

437

For %

55.0%

Failed

Referendum to issue debt (general obligation bonds): construct new PK-6 school; repairs to MS, HS; related cost for architect/engineer/bond counsel

For

478

Against

586

For %

44.9%

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2000-2001 $302,000; 2001-2002 $302,000 (total $604,000)

For

585

Against

533

For %

52.3%

Failed

Referendum to exceed revenue limit (recurring): $500,000 recurring

For

1,164

Against

1,359

For %

46.1%

Freedom Area School District

Bond · Outagamie · $12.8M

Failed

Referendum to issue debt (general obligation bonds): capital improvements

For

681

Against

957

For %

41.6%

Freedom Area School District

Override · Outagamie

Failed

Referendum to exceed revenue limit (recurring): $325,000 recurring

For

746

Against

894

For %

45.5%

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2001-2002 $650,000; 2002-2003 $775,000 (total $1,425,000)

For

956

Against

806

For %

54.3%

Lake Geneva J1 School District

Bond · Walworth · $3.0M

Passed

Referendum to issue debt (general obligation bonds): additition to Star Center

For

964

Against

412

For %

70.1%

Lake Geneva J1 School District

Override · Walworth

Passed

Referendum to exceed revenue limit (recurring): $300,000 recurring

For

840

Against

495

For %

62.9%

Mosinee School District

Bond · Marathon · $8.0M

Failed

Referendum to issue debt (general obligation bonds): construct/equip new K-1 elementary school; remodel,improve, construct addition Mosinee Elem school

For

1,194

Against

1,420

For %

45.7%

Mosinee School District

Override · Marathon

Failed

Referendum to exceed revenue limit (recurring): $525,000 recurring

For

1,043

Against

1,418

For %

42.4%

Phillips School District

Bond · Price · $2.6M

Failed

Referendum to issue debt (general obligation bonds): addition to HS and remodel/improvements to HS; equip acquisition

For

896

Against

919

For %

49.4%

Phillips School District

Override · Price

Failed

Referendum to exceed revenue limit (recurring): $150,000 recurring

For

807

Against

976

For %

45.3%

Poynette School District

Override · Columbia, Dane

Passed

Referendum to exceed revenue limit (recurring): $200,000 recurring

For

535

Against

493

For %

52.0%

Prescott School District

Bond · Pierce · $13.6M

Failed

Referendum to issue debt (general obligation bonds): purchase property; construct new MS; construct addition to and remodel Malone elementary

For

731

Against

879

For %

45.4%

Royall School District

Bond · Juneau, Monroe, Vernon · $9.1M

Failed

Referendum to issue debt (general obligation bonds): building/remodeling HS, MS, elem school

For

398

Against

1,016

For %

28.1%

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2000-2001 $1,350,000; 2001-2002 $1,350,000 (total $2,700,000)

For

7,655

Against

3,345

For %

69.6%

Turtle Lake School District

Bond · Barron, Polk · $3.9M

Failed

Referendum to issue debt (general obligation bonds): remodel/renovating and construct addition to HS and elem school/furnishings, furniture and equipment

For

368

Against

414

For %

47.1%

Webster School District

Bond · Burnett, Douglas · $9.9M

Passed

Referendum to issue debt (general obligation bonds): build a grade 5-12 school facility; site work; acquire equip, furnishings, fixtures

For

1,372

Against

793

For %

63.4%

Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.