Wisconsin · School bond & tax election
October 2001 Results
9 tracked measures in this cycle—6 passed and 3 failed (67% passage rate), totaling $27.1M in approved bonds.
- Passed
- 6
- Failed
- 3
- Bond $ approved
- $27.1M
Full results
9 tracked measures · 6 passed · 3 failed.
Showing 9 of 9
Bond · Eau Claire, Polk, St. Croix · $12.9M
Referendum to issue debt (general obligation bonds): construct/equip new intermediate school, remove existing intermediate school, repair/improve Lien Elementary school
For
1,411
Against
656
For %
68.3%
Override · Green Lake
Referendum to exceed revenue limit (non-recurring + recurring, one question): non-recurring: 2001-2002 $300,000; 2002-2003 $300,000 (total $600,000) | $600,000 recurring
For
557
Against
263
For %
67.9%
Bond · Green Lake · $2.0M
Referendum to issue debt (general obligation bonds): remodel, renovate, improve school facilities; construct additions; equipment; acquire parcel of property as site
For
546
Against
270
For %
66.9%
Override · St. Croix
Referendum to exceed revenue limit (recurring): $1,230,000 recurring
For
2,031
Against
919
For %
68.8%
Bond · St. Croix · $12.2M
Referendum to issue debt (general obligation bonds): building additions, improvements, and remodeling; purchase 82 acres of land; instructional technology
For
1,875
Against
1,073
For %
63.6%
Override · St. Croix
Referendum to exceed revenue limit (recurring): $530,000 recurring
For
1,805
Against
1,132
For %
61.5%
Bond · Polk · $7.8M
Referendum to issue debt (general obligation bonds): school building and improvement program; repairs/maintenance, remodeling, equipment, partial demolition and reconstruction
For
304
Against
473
For %
39.1%
Saint Croix Central School District
Override · St. Croix
Referendum to exceed revenue limit (recurring): $90,000 recurring
For
341
Against
748
For %
31.3%
Saint Croix Central School District
Override · St. Croix
Referendum to exceed revenue limit (recurring): $335,000 recurring
For
345
Against
751
For %
31.5%
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.