Wisconsin · School bond & tax election
November 2013 Results
6 tracked measures in this cycle—4 passed and 2 failed (67% passage rate), totaling $61.8M in approved bonds.
- Passed
- 4
- Failed
- 2
- Bond $ approved
- $61.8M
Full results
6 tracked measures · 4 passed · 2 failed.
Showing 6 of 6
Bond · Trempealeau, Buffalo · $14.0M
Referendum to issue debt (general obligation bonds): 12,000,000 construction on a new grade 5-8 school and $2,000,000 update to existing elementary building.
For
556
Against
492
For %
53.0%
Bond · Calumet, Brown, Manitowoc · $5.3M
Referendum to issue debt (general obligation bonds): For the purpose of paying the cost of remodeling, renovation and addition projects at the elementary and middle schools.
For
478
Against
504
For %
48.7%
Bond · Barron · $23.5M
Referendum to issue debt (general obligation bonds): Construct new elementary school building, athletic fields, addition and renovation of the high school, high school and middle school safety improvments.
For
600
Against
349
For %
63.2%
Bond · Walworth · $5.5M
Referendum to issue debt (general obligation bonds): Building addition and renovation
For
70
Against
208
For %
25.2%
Bond · Richland, Sauk · $4.0M
Referendum to issue debt (general obligation bonds): for the public purpose of paying the cost of remodeling, improving, repairing and constructing an addition to the Elementary School facilities; constructing additions to the District's art room and to...
For
288
Against
113
For %
71.8%
Rice Lake Area School District
Bond · Barron, Rusk, Washburn · $20.3M
Referendum to issue debt (general obligation bonds): To issue debt to construct additions and remodel portions of the high school, middle school, and Tainter elementary to include an addition to Tainter Elementary to accomodate the transfer of students ...
For
1,678
Against
1,205
For %
58.2%
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.