Wisconsin · School bond & tax election
June 2003 Results
4 tracked measures in this cycle—1 passed and 3 failed (25% passage rate).
- Passed
- 1
- Failed
- 3
- Bond $ approved
- —
Full results
4 tracked measures · 1 passed · 3 failed.
Showing 4 of 4
Bond · Grant, Lafayette · $7.0M
Referendum to issue debt (general obligation bonds): add to, renovate, remodel and improve elementary and High School facilities, acquire related equipment
For
712
Against
797
For %
47.2%
Bond · Sheboygan · $9.8M
Referendum to issue debt (general obligation bonds): additions/renovations to and remodeling of existing facilities including site preparation and improvements, furnishings and equipment, architectural, engineering and bond issuance costs
For
488
Against
509
For %
49.0%
Madison Metropolitan School District
Override · Dane
Referendum to exceed revenue limit (non-recurring): non-recurring: 2003-2004 $12,300,000
For
18,433
Against
17,468
For %
51.3%
Plymouth Joint School District
Override · Sheboygan
Referendum to exceed revenue limit (non-recurring): non-recurring: 2003-2004 $1,400,000; 2004-2005 $1,400,000; 2005-2006 $1,400,000; 2006-2007 $1,400,000; 2007-2008 $1,400,000 (total $7,000,000)
For
1,049
Against
2,929
For %
26.4%
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.