Wisconsin · School bond & tax election
February 2002 Results
6 tracked measures in this cycle—4 passed and 2 failed (67% passage rate), totaling $67.3M in approved bonds.
- Passed
- 4
- Failed
- 2
- Bond $ approved
- $67.3M
Full results
6 tracked measures · 4 passed · 2 failed.
Showing 6 of 6
Bond · Dane · $10.2M
Referendum to issue debt (general obligation bonds): construct/equip new elementary school including district office space
For
853
Against
343
For %
71.3%
Mequon-Thiensville School District
Override · Ozaukee
Referendum to exceed revenue limit (non-recurring): non-recurring $9,500,000
For
1,962
Against
2,700
For %
42.1%
Bond · Price, Lincoln, Oneida · $7.8M
Referendum to issue debt (general obligation bonds): addition/improvements to Prentice school building; k-8 addition and related improvements including roofing and heating systems replacements; land acquisition
For
601
Against
735
For %
45.0%
South Milwaukee School District
Bond · Milwaukee · $42.0M
Referendum to issue debt (general obligation bonds): acquire land, construct/equip new HS; convert old HS into new MS; modify old MS
For
3,209
Against
2,313
For %
58.1%
Bond · La Crosse · $8.2M
Referendum to issue debt (general obligation bonds): construct building addition, remodel/renovate mechanical systems at HS; acquire equipment, furnishings, fixtures
For
1,444
Against
735
For %
66.3%
Bond · La Crosse · $6.9M
Referendum to issue debt (general obligation bonds): construct building addition, remodel/renovate existing HS gym for use as auditorium; construct new gym/athletic building addition to existing HS; equipment/furnishings/fixtures
For
1,082
Against
1,058
For %
50.6%
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.