Wisconsin · Milwaukee, Waukesha County
West Allis-West Milwaukee School District
Voters have decided 10 school bond and tax measures here—5 passed and 5 failed (50% passage rate), totaling $90.5M in approved bonds.
Compare with other districts- Passed
- 5
- Failed
- 5
- Bond $ approved
- $90.5M
Full results
10 tracked measures · 5 passed · 5 failed.
Showing 10 of 10
Bond · Milwaukee, Waukesha · Nov 2024 · $70.0M
Referendum to issue debt (general obligation bonds): District-wide school facility improvement project consisting of: safety, security, and accessibility updates; roofing, HVAC, boiler, technical education, building infrastructure and site repairs; capi...
For
20,481
Against
11,312
For %
64.4%
Override · Milwaukee, Waukesha · Nov 2024
Referendum to exceed revenue limit (recurring): $5,800,000 recurring
For
19,347
Against
12,661
For %
60.4%
Bond · Milwaukee, Waukesha · Apr 2022 · $150M
Referendum to issue debt (general obligation bonds): For the public purpose of paying the cost of a school building and facility improvement project to create a single comprehensive high school at a current district high school site, consisting of: safe...
For
4,214
Against
6,026
For %
41.1%
Override · Milwaukee, Waukesha · Apr 2017
Referendum to exceed revenue limit (non-recurring): non-recurring: 2017-2018 $2,500,000; 2018-2019 $2,500,000; 2019-2020 $2,500,000; 2020-2021 $2,500,000; 2021-2022 $2,500,000 (total $12,500,000)
For
4,308
Against
5,495
For %
44.0%
Bond · Milwaukee, Waukesha · Apr 2003 · $12.0M
Referendum to issue debt (general obligation bonds): maintain, repair, renovate, remodel, improve school facilities; purchase, upgrade, replace equipment, systems and technology
For
4,046
Against
3,523
For %
53.5%
Bond · Milwaukee, Waukesha · Feb 1999 · $3.5M
Referendum to issue debt (general obligation bonds): add to & remodel high school and 4 elem. schools
For
3,261
Against
2,727
For %
54.5%
Bond · Milwaukee, Waukesha · Dec 1995 · $5.0M
Referendum to issue debt (general obligation bonds): $9,000,000 renov & reopen old school bld,
For
3,730
Against
1,416
For %
72.5%
Bond · Milwaukee, Waukesha · Feb 1995 · $7.3M
Referendum to issue debt (general obligation bonds): renov & reopen old school bld,
For
3,929
Against
4,144
For %
48.7%
Bond · Milwaukee, Waukesha · Apr 1992 · $11.0M
Referendum to issue debt (general obligation bonds)
For
7,018
Against
13,094
For %
34.9%
Bond · Milwaukee, Waukesha · Feb 1992 · $11.0M
Referendum to issue debt (general obligation bonds)
For
5,992
Against
6,639
For %
47.4%
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.