Menu

Wisconsin · Racine, Kenosha County

Union Grove UHS School District

Voters have decided 7 school bond and tax measures here—5 passed and 2 failed (71% passage rate), totaling $45.7M in approved bonds.

Compare with other districts
Passed
5
Failed
2
Bond $ approved
$45.7M

Full results

7 tracked measures · 5 passed · 2 failed.

Showing 7 of 7

Bond · Racine, Kenosha · Nov 2024 · $34.9M

Passed

Referendum to issue debt (general obligation bonds): Cost of a school building and facility improvement project consisting of: construction of additions and renovations to the High School building, including for secure entrances, technical education spa...

For

4,486

Against

3,627

For %

55.3%

Bond · Racine, Kenosha · Nov 2017 · $7.8M

Passed

Referendum to issue debt (general obligation bonds): Construction of an agricultural building and greenhouse on land owned by the District; remodeling and renovations in the technology education department; improvements to the science classrooms and con...

For

789

Against

728

For %

52.0%

Bond · Racine, Kenosha · May 2012 · $1.9M

Passed

Referendum to issue debt (general obligation bonds): cost of repairing and upgrading the school site to improve drainage; replacing the track; improving the athletic field and replacing the natural turf with artificial turf; and acquiring and installing...

For

970

Against

868

For %

52.8%

Bond · Racine, Kenosha · Sep 2010 · $1.4M

Failed

Referendum to issue debt (general obligation bonds): repair school site to improve draginage; replace track; improve the athletic field and replace with artificial turf

For

1,205

Against

1,517

For %

44.3%

Bond · Racine, Kenosha · Sep 2010 · $320K

Passed

Referendum to issue debt (general obligation bonds): renovating and improving the science classrooms and labs.

For

1,662

Against

1,006

For %

62.3%

Override · Racine, Kenosha · Apr 2003

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2003-2004 $300,000; 2004-2005 $300,000; 2005-2006 $300,000 (total $900,000)

For

1,067

Against

1,770

For %

37.6%

Bond · Racine, Kenosha · Apr 2000 · $780K

Passed

Referendum to issue debt (general obligation bonds): replace roofs, replace football/baseball bleachers, construct new press box/concession stand, install hallway security system, phone system, replace exhaust fans

For

1,075

Against

791

For %

57.6%

Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.

Union Grove UHS School District — School Bond & Tax Election History | PBK Elections Data Archive