Wisconsin · Dodge, Columbia County
Randolph School District
Voters have decided 8 school bond and tax measures here—4 passed and 4 failed (50% passage rate), totaling $18.2M in approved bonds.
Compare with other districts- Passed
- 4
- Failed
- 4
- Bond $ approved
- $18.2M
Full results
8 tracked measures · 4 passed · 4 failed.
Showing 8 of 8
Override · Dodge, Columbia · Apr 2026
Referendum to exceed revenue limit (non-recurring): non-recurring: 2026-2027 $975,000; 2027-2028 $975,000; 2028-2029 $975,000 (total $2,925,000)
For
564
Against
514
For %
52.3%
Override · Dodge, Columbia · Apr 2025
Referendum to exceed revenue limit (non-recurring): non-recurring: 2025-2026 $1,200,000
For
548
Against
789
For %
41.0%
Bond · Dodge, Columbia · Apr 2015 · $17.6M
Referendum to issue debt (general obligation bonds): Facilities new construction and renovation, addition of furnishings and equipment as needed, demolition of old school building if required
For
554
Against
500
For %
52.6%
Bond · Dodge, Columbia · Nov 2010 · $12.6M
Referendum to issue debt (general obligation bonds): paying the cost of constructing a grade 6-8 Middle School and gym additions to the existing high school; and acquiring equipment, furnishings and fixtures
For
143
Against
825
For %
14.8%
Bond · Dodge, Columbia · Nov 2010 · $20.8M
Referendum to issue debt (general obligation bonds): paying the cost of constructing a grade K-8 and gym additions to the existing high school; and acquiring equipment, furnishings and fixtures
For
382
Against
881
For %
30.3%
Bond · Dodge, Columbia · Sep 1997 · $614K
Referendum to issue debt (general obligation bonds): add to and remodel high school
For
286
Against
273
For %
51.2%
Override · Dodge, Columbia · Sep 1997
Referendum to exceed revenue limit (recurring): $125,000 recurring
For
329
Against
230
For %
58.9%
Bond · Dodge, Columbia · Apr 1997 · $985K
Referendum to issue debt (general obligation bonds): addition & remodeling to high school
For
353
Against
426
For %
45.3%
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.