Menu

Wisconsin · Waupaca, Columbia, Dane, Dodge County

Columbus School District

Voters have decided 13 school bond and tax measures here—5 passed and 8 failed (38% passage rate), totaling $36.8M in approved bonds.

Compare with other districts
Passed
5
Failed
8
Bond $ approved
$36.8M

Full results

13 tracked measures · 5 passed · 8 failed.

Showing 13 of 13

Override · Waupaca, Columbia, Dane, Dodge · Apr 2025

Passed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2025-2026 $1,750,000; 2026-2027 $1,750,000; 2027-2028 $1,750,000; 2028-2029 $1,750,000 (total $7,000,000)

For

1,931

Against

1,693

For %

53.3%

Bond · Waupaca, Columbia, Dane, Dodge · Apr 2020 · $30.0M

Passed

Referendum to issue debt (general obligation bonds): Facilities improvements to the elementary and high school; maintenance and infrastructure improvements at all district buildings, acquisition of land; and acquisition of furnishings and equipment

For

1,879

Against

1,095

For %

63.2%

Bond · Waupaca, Columbia, Dane, Dodge · May 2014 · $1.3M

Failed

Referendum to issue debt (general obligation bonds): Paying the costs of acquiring approximately 88 acres of land located south of Maple Avenue and east of Highway 151 as a school site

For

878

Against

905

For %

49.2%

Bond · Waupaca, Columbia, Dane, Dodge · Apr 2013 · $9.3M

Failed

Referendum to issue debt (general obligation bonds): Paying the cost of creating secured entries at school district buildings; acquisition and installation of technology equipment and infrastructure; adding a restroom facility at the existing high schoo...

For

1,219

Against

1,748

For %

41.1%

Bond · Waupaca, Columbia, Dane, Dodge · Apr 2013 · $30.6M

Failed

Referendum to issue debt (general obligation bonds): New High School; renovations and improvements to existing high school to convert it to a middle school and demolishing the existing middle school.

For

1,090

Against

1,891

For %

36.6%

Override · Waupaca, Columbia, Dane, Dodge · Jun 2007

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $300,000; 2008-2009 $300,000; 2010-2011 $300,000; 2011-2012 $300,000 (total $1,200,000)

For

524

Against

675

For %

43.7%

Override · Waupaca, Columbia, Dane, Dodge · Jun 2007

Failed

Referendum to exceed revenue limit (non-recurring): non-recurring: 2007-2008 $200,000; 2008-2009 $200,000; 2009-2010 $200,000 (total $600,000)

For

387

Against

815

For %

32.2%

Bond · Waupaca, Columbia, Dane, Dodge · Jun 2007 · $700K

Passed

Referendum to issue debt (general obligation bonds): $700,000 General Obligation School Improvement Bonds (roof replacements, safety upgrades, capital maintenance and improvement projects). Repay over 10 years.

For

781

Against

422

For %

64.9%

Bond · Waupaca, Columbia, Dane, Dodge · Nov 2003 · $3.3M

Passed

Referendum to issue debt (general obligation bonds): refinance debt, acquire heating/air conditioning equipment, improvements including roofing, mold remediation, and heating and ventilation systems

For

782

Against

718

For %

52.1%

Override · Waupaca, Columbia, Dane, Dodge · Apr 2003

Failed

Referendum to exceed revenue limit (recurring): $700,000 recurring

For

474

Against

2,116

For %

18.3%

Bond · Waupaca, Columbia, Dane, Dodge · Apr 2003 · $3.3M

Failed

Referendum to issue debt (general obligation bonds): maintenance, renovations and refinancing

For

1,125

Against

1,514

For %

42.6%

Bond · Waupaca, Columbia, Dane, Dodge · Apr 2003 · $28.3M

Failed

Referendum to issue debt (general obligation bonds): acquire land, construct new High School

For

453

Against

2,147

For %

17.4%

Bond · Waupaca, Columbia, Dane, Dodge · Jun 1994 · $2.8M

Passed

Referendum to issue debt (general obligation bonds): elem gym lib music art adm & 7 classroom

For

655

Against

325

For %

66.8%

Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.