Menu

ESC Region 15 · Sutton County

Sonora ISD

Voters have decided 6 bond and VATRE measures here, May 2011 to May 2024 — 3 passed and 3 failed (50% passage rate), totaling $20.9M in approved bonds.

Passed
3
Failed
3
Bonds approved
$20.9M

Election timeline

  1. May 2011
  2. Nov 2012
  3. Nov 2018
  4. May 2024
  5. May 2024
  6. May 2024

May vs November passage rate

How tracked measures fared in spring (May) versus fall (November) elections.

May elections
25%passage rate

1 passed · 3 failed · 4 total

November elections
100%passage rate

2 passed · 0 failed · 2 total

Average bond pacing

Returns to voters about every 4 years.

4.3 yrsbetween bond elections

Election history

6 tracked measures · 6 bond · 0 VATRE.

Compare districts

May 2024 · Bond

$17.9M

Passed

School building / Facilities

For

257

Against

175

For %

59.5%

May 2024 · Bond

$45.0M · Prop A

Failed

For

347

Against

446

For %

43.8%

May 2024 · Bond

$15.0M · Prop B

Failed

For

362

Against

446

For %

44.8%

Nov 2018 · Bond

$1.6M

Passed

School building / Facilities

For

614

Against

552

For %

52.7%

Nov 2012 · Bond

$1.4M

Passed

School building / Facilities

For

804

Against

383

For %

67.7%

May 2011 · Bond

$5.0M

Failed

School building / Facilities

For

158

Against

174

For %

47.6%

Compiled from public election records. Figures are unofficial.