Menu

ESC Region 10 · Navarro County

Corsicana ISD

Voters have decided 5 bond and VATRE measures here, May 2013 to Nov 2025 — 2 passed and 3 failed (40% passage rate), totaling $255M in approved bonds.

Passed
2
Failed
3
Bonds approved
$255M

Election timeline

  1. May 2013
  2. Nov 2014
  3. May 2022
  4. May 2022
  5. Nov 2025

May vs November passage rate

How tracked measures fared in spring (May) versus fall (November) elections.

May elections
0%passage rate

0 passed · 3 failed · 3 total

November elections
100%passage rate

2 passed · 0 failed · 2 total

Average bond pacing

Returns to voters about every 4 years.

4.2 yrsbetween bond elections

Election history

5 tracked measures · 5 bond · 0 VATRE.

Compare districts

Nov 2025 · Bond

$205M · Prop A

Passed

For

1,797

Against

1,709

For %

51.3%

May 2022 · Bond

$70.4M · Prop A

Failed

School building

For

1,124

Against

1,393

For %

44.7%

May 2022 · Bond

$9.6M · Prop B

Failed

Multipurpose Facility

For

886

Against

1,626

For %

35.3%

Nov 2014 · Bond

$49.7M

Passed

School building / Facilities

For

2,598

Against

2,298

For %

53.1%

May 2013 · Bond

$54.0M

Failed

School building / Facilities

For

344

Against

426

For %

44.7%

Compiled from public election records. Figures are unofficial.