Menu

ESC Region 4 · Brazoria County

Columbia-Brazoria ISD

Voters have decided 6 bond and VATRE measures here, Nov 2006 to Nov 2022 — 3 passed and 3 failed (50% passage rate), totaling $95.5M in approved bonds.

Passed
3
Failed
3
Bonds approved
$95.5M

Election timeline

  1. Nov 2006
  2. Nov 2007
  3. Nov 2007
  4. May 2013
  5. Nov 2019
  6. Nov 2022

May vs November passage rate

How tracked measures fared in spring (May) versus fall (November) elections.

May elections
100%passage rate

1 passed · 0 failed · 1 total

November elections
40%passage rate

2 passed · 3 failed · 5 total

Average bond pacing

Returns to voters about every 4 years.

4.0 yrsbetween bond elections

Election history

6 tracked measures · 6 bond · 0 VATRE.

Compare districts

Nov 2022 · Bond

$79.0M

Passed

School building / Facilities

For

3,568

Against

3,399

For %

51.2%

Nov 2019 · Bond

$11.5M

Passed

School building / Facilities

For

1,281

Against

883

For %

59.2%

May 2013 · Bond

$5.0M

Passed

School building / Facilities

For

506

Against

494

For %

50.6%

Nov 2007 · Bond

$12.8M · Prop 1

Failed

For

907

Against

1,279

For %

41.5%

Nov 2007 · Bond

$3.0M · Prop 2

Failed

For

873

Against

1,315

For %

39.9%

Nov 2006 · Bond

$35.0M

Failed

School building / Facilities

For

1,302

Against

3,588

For %

26.6%

Compiled from public election records. Figures are unofficial.