Menu

ESC Region 6 · Washington County

Brenham ISD

Voters have decided 6 bond and VATRE measures here, May 2012 to Nov 2025 — 3 passed and 3 failed (50% passage rate), totaling $65.0M in approved bonds.

Passed
3
Failed
3
Bonds approved
$65.0M

Election timeline

  1. May 2012
  2. May 2022
  3. Nov 2022
  4. Nov 2022
  5. Nov 2025
  6. Nov 2025

May vs November passage rate

How tracked measures fared in spring (May) versus fall (November) elections.

May elections
50%passage rate

1 passed · 1 failed · 2 total

November elections
50%passage rate

2 passed · 2 failed · 4 total

Average bond pacing

Returns to voters about every 4 years.

4.5 yrsbetween bond elections

Election history

6 tracked measures · 5 bond · 1 VATRE.

Compare districts

Nov 2025 · VATRE

+300¢

Passed

Maintenance & Operations (VATRE)

For

3,036

Against

2,659

For %

53.3%

Nov 2025 · Bond

$39.0M · Prop A

Passed

For

3,267

Against

2,431

For %

57.3%

Nov 2022 · Bond

$111M · Prop 1

Failed

For

5,170

Against

6,831

For %

43.1%

Nov 2022 · Bond

$25.0M · Prop 2

Failed

For

5,183

Against

6,798

For %

43.3%

May 2022 · Bond

$154M

Failed

School building

For

1,750

Against

2,255

For %

43.7%

May 2012 · Bond

$26.0M

Passed

School building / Facilities

For

1,216

Against

341

For %

78.1%

Compiled from public election records. Figures are unofficial.