Menu

ESC Region 4 · Brazoria County

Brazosport ISD

Voters have decided 6 bond and VATRE measures here, Nov 2009 to May 2025 — 3 passed and 3 failed (50% passage rate), totaling $482M in approved bonds.

Passed
3
Failed
3
Bonds approved
$482M

Election timeline

  1. Nov 2009
  2. May 2012
  3. Nov 2014
  4. May 2019
  5. May 2025
  6. May 2025

May vs November passage rate

How tracked measures fared in spring (May) versus fall (November) elections.

May elections
50%passage rate

2 passed · 2 failed · 4 total

November elections
50%passage rate

1 passed · 1 failed · 2 total

Average bond pacing

Returns to voters about every 4 years.

3.9 yrsbetween bond elections

Election history

6 tracked measures · 6 bond · 0 VATRE.

Compare districts

May 2025 · Bond

$161M · Prop A

Failed

For

1,596

Against

1,720

For %

48.1%

May 2025 · Bond

$6.1M · Prop B

Failed

For

1,603

Against

1,702

For %

48.5%

May 2019 · Bond

$267M

Passed

School building / Facilities

For

2,980

Against

808

For %

78.7%

Nov 2014 · Bond

$175M

Passed

School building / Facilities

For

6,972

Against

3,464

For %

66.8%

May 2012 · Bond

$40.3M

Passed

School building / Facilities

For

2,960

Against

2,340

For %

55.8%

Nov 2009 · Bond

$166M

Failed

School building / Facilities

For

2,190

Against

2,696

For %

44.8%

Compiled from public election records. Figures are unofficial.