Oklahoma · School bond & tax election
June 2021 Results
5 tracked measures in this cycle—5 passed and 0 failed (100% passage rate), totaling $414M in approved bonds.
- Passed
- 5
- Failed
- 0
- Bond $ approved
- $414M
Full results
5 tracked measures · 5 passed · 0 failed.
Showing 5 of 5
Bond · Greer, Jackson · $465K
General obligation school bonds: transportation equipment
For
86
Against
50
For %
63.2%
Needs 60% to pass
Bond · Creek, Osage, Tulsa, Wagoner · $167M
General obligation school bonds: buildings/construction
For
12,756
Against
4,874
For %
72.3%
Needs 60% to pass
Bond · Creek, Osage, Tulsa, Wagoner · $90.7M
General obligation school bonds: buildings/construction, technology
For
12,774
Against
4,815
For %
72.6%
Needs 60% to pass
Bond · Creek, Osage, Tulsa, Wagoner · $17.3M
General obligation school bonds: transportation equipment
For
12,514
Against
4,956
For %
71.6%
Needs 60% to pass
Bond · Creek, Osage, Tulsa, Wagoner · $139M
General obligation school bonds: buildings/construction, technology
For
12,862
Against
4,767
For %
73.0%
Needs 60% to pass
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.