Massachusetts · School bond & tax election
September 2009 Results
2 tracked measures in this cycle—0 passed and 2 failed (0% passage rate).
- Passed
- 0
- Failed
- 2
- Bond $ approved
- —
Full results
2 tracked measures · 0 passed · 2 failed.
Showing 2 of 2
Override · Franklin County
Proposition 2½ general override: Installing Central Heating And Air Ducts And Add Central Air To All Three Buildings An Pioneer Valley Regional School Central Office [district named: Pioneer Valley]
For
88
Against
238
For %
27.0%
Northfield
Override · Franklin County
Proposition 2½ general override: Repainting First Floor Phase 1 Classrooms And Corridors, Resealing And Replacing Carpets
For
77
Against
254
For %
23.3%
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.