Menu

Massachusetts · School bond & tax election

November 1990 Results

12 tracked measures in this cycle—7 passed and 5 failed (58% passage rate).

Passed
7
Failed
5
Bond $ approved
—

Full results

12 tracked measures · 7 passed · 5 failed.

Showing 12 of 12

Ashland

Debt exclusion · Middlesex County

Passed

Proposition 2½ debt exclusion: Repair High School Roof

For

3,172

Against

1,870

For %

62.9%

Grafton

Debt exclusion · Worcester County

Passed

Proposition 2½ debt exclusion: Add To Grafton Mem Sr High,Ren Midd Sch

For

2,857

Against

2,327

For %

55.1%

Mendon

Debt exclusion · Worcester County

Passed

Proposition 2½ debt exclusion: Repair Roofs At Distict Schools

For

1,155

Against

692

For %

62.5%

Mendon

Debt exclusion · Worcester County

Passed

Proposition 2½ debt exclusion: Replace Doorways/Repair Gym Floor/At Sch

For

1,049

Against

790

For %

57.0%

Sandisfield

Override · Berkshire County

Passed

Proposition 2½ general override: Prop 2 1/2 Sum For Schools

For

112

Against

107

For %

51.1%

Southbridge

Debt exclusion · Worcester County

Passed

Proposition 2½ debt exclusion: Additions And Renov To 3 Elem Schools

For

2,760

Against

2,448

For %

53.0%

Ware

Override · Hampshire County

Failed

Proposition 2½ general override: Note Pre And Admin Costs Ware Elementary

For

489

Against

807

For %

37.7%

Ware

Override · Hampshire County

Failed

Proposition 2½ general override: Note Pre, Admin Costs New Boiler Ware Mid

For

486

Against

815

For %

37.4%

West Tisbury

Override · Dukes County

Failed

Proposition 2½ general override: Fund Assessmt. Program At Elementary Sch.

For

304

Against

593

For %

33.9%

West Tisbury

Override · Dukes County

Failed

Proposition 2½ general override: Fund Elementary School Budget

For

409

Against

504

For %

44.8%

West Tisbury

Override · Dukes County

Failed

Proposition 2½ general override: Fund Special Needs Program

For

434

Against

474

For %

47.8%

Winchendon

Debt exclusion · Worcester County

Passed

Proposition 2½ debt exclusion: Construct/Equip New High/Middle School

For

855

Against

781

For %

52.3%

Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.