Massachusetts · Middlesex County County
Weston
Voters have decided 27 school bond and tax measures here—27 passed and 0 failed (100% passage rate).
Compare with other districts- Passed
- 27
- Failed
- 0
- Bond $ approved
- —
Full results
27 tracked measures · 27 passed · 0 failed.
Showing 25 of 27
Debt exclusion · Middlesex County · May 2022
Proposition 2½ debt exclusion: Bonds For 6 Items Dpw Drainage, Rt 20 Intersection, Bogle Brook Culvert, School Snow Removal, Air Supply Vehicle, It Update Phase 2
For
518
Against
296
For %
63.6%
Debt exclusion · Middlesex County · May 2021
Proposition 2½ debt exclusion: Bonds To Construct Drainage Improvements, F Wing High School Roof, Pumper Engine
For
757
Against
441
For %
63.2%
Debt exclusion · Middlesex County · Sep 2020
Proposition 2½ debt exclusion: Bonds For Drainage And Town And School Network Improvements
For
1,362
Against
779
For %
63.6%
Debt exclusion · Middlesex County · May 2016
Proposition 2½ debt exclusion: Bonds For Drainage Improvements, Middle School Paving, Police Fiber Loop, Pond And Dam Rehab, Case House, Case Campus, Proctor Field
For
635
Against
222
For %
74.1%
Debt exclusion · Middlesex County · May 2015
Proposition 2½ debt exclusion: Bonds For Field School, Dpw Drainage, Case Campus Master Plan
For
858
Against
351
For %
71.0%
Debt exclusion · Middlesex County · Nov 2011
Proposition 2½ debt exclusion: Design, Engineer, Construct And Equip A New Field School On Alphabet Lane In Weston.
For
849
Against
231
For %
78.6%
Debt exclusion · Middlesex County · May 2011
Proposition 2½ debt exclusion: Design, Engineer, Replace Boiler At Weston High School
For
388
Against
57
For %
87.2%
Debt exclusion · Middlesex County · May 2011
Proposition 2½ debt exclusion: Design, Equip, Engineer And Construct H.S. Science Lab Sprinkler System, Energy Engineering Upgrades To Municipal And School Bldgs. Dpw Drainage Improvement Projects And H.S. Science Lab Improvements
For
377
Against
69
For %
84.5%
Debt exclusion · Middlesex County · May 2011
Proposition 2½ debt exclusion: Design, Engineer And Construct New Roof For Weston Middle School
For
385
Against
60
For %
86.5%
Debt exclusion · Middlesex County · May 2010
Proposition 2½ debt exclusion: High School Science Lab Fees; School Technology Fees; Dpw Equipment And Drainage Improvements; Fire Dept. Equip; Technology-Telephone Systems; School Bus Replacemtns
For
148
Against
46
For %
76.3%
Debt exclusion · Middlesex County · May 2009
Proposition 2½ debt exclusion: Design, Engineer, Const And Equip - Dpw Facility-Dpw Equipment Replacement- School Technology- Dpw Facility Construction- Dpw Equipment Replacement- School Technoogy And School Bus Replacements
For
844
Against
301
For %
73.7%
Debt exclusion · Middlesex County · May 2009
Proposition 2½ debt exclusion: Pay Costs For Feasiblity Study To Examine Potential Improvement Options For The Field School
For
816
Against
320
For %
71.8%
Debt exclusion · Middlesex County · May 2007
Proposition 2½ debt exclusion: Design,Engineer,Construct And Equip High School, Middle School Wastewater Treatment Facility, Dpw Equipment Replacement, Drainage Improvements; Sidewalk Recon.Police Info Systems Upgrade Fire Ladder Replacement; Etc.
For
131
Against
41
For %
76.2%
Debt exclusion · Middlesex County · May 2004
Proposition 2½ debt exclusion: School-Public Works-Fire Station Repairs;Technology Equipment
For
287
Against
117
For %
71.0%
Debt exclusion · Middlesex County · May 2002
Proposition 2½ debt exclusion: Country & Woodland Schools Engineering Services
For
305
Against
135
For %
69.3%
Debt exclusion · Middlesex County · May 2001
Proposition 2½ debt exclusion: Repair And Reconstruct County And Woodland School Facilities
For
1,076
Against
360
For %
74.9%
Debt exclusion · Middlesex County · May 2000
Proposition 2½ debt exclusion: Repairs To Country And Woodland School
For
731
Against
162
For %
81.9%
Debt exclusion · Middlesex County · May 1999
Proposition 2½ debt exclusion: Equip-Furnish Addit. To Weston High Scho
For
636
Against
188
For %
77.2%
Debt exclusion · Middlesex County · May 1998
Proposition 2½ debt exclusion: Remodel Middle School
For
779
Against
199
For %
79.7%
Debt exclusion · Middlesex County · May 1997
Proposition 2½ debt exclusion: Equip And Furnish Middle School
For
909
Against
755
For %
54.6%
Debt exclusion · Middlesex County · May 1996
Proposition 2½ debt exclusion: Equipping And Constructing High School
For
820
Against
279
For %
74.6%
Debt exclusion · Middlesex County · May 1994
Proposition 2½ debt exclusion: Renovations To Field School
For
421
Against
187
For %
69.2%
Debt exclusion · Middlesex County · Sep 1992
Proposition 2½ debt exclusion: Energy Conservation - School Buildings
For
1,112
Against
342
For %
76.5%
Debt exclusion · Middlesex County · May 1988
Proposition 2½ debt exclusion: School
For
825
Against
422
For %
66.2%
Debt exclusion · Middlesex County · May 1986
Proposition 2½ debt exclusion: Schools
For
709
Against
212
For %
77.0%
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.