Menu

Iowa · School bond & tax election

September 2012 Results

10 tracked measures in this cycle—8 passed and 2 failed (80% passage rate).

Passed
8
Failed
2
Bond $ approved
—

Full results

10 tracked measures · 8 passed · 2 failed.

Showing 10 of 10

Akron Westfield Comm School District

Capital levy · Plymouth

Passed

Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)

For

—

Against

—

For %

76.0%

Passed

Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)

For

—

Against

—

For %

80.9%

Colfax-Mingo Comm School District

Bond · Jasper · $3.7M

Failed

General obligation school bonds (Iowa Code 296.6 / 75.1)

For

—

Against

—

For %

39.9%

Needs 60% to pass

Colfax-Mingo Comm School District

Capital levy · Jasper

Passed

Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)

For

—

Against

—

For %

53.0%

Gladbrook-Reinbeck Comm School District

Capital levy · Black Hawk, Grundy, Marshall, Tama

Passed

Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)

For

—

Against

—

For %

90.8%

Johnston Comm School District

Bond · Polk · $51.0M

Failed

General obligation school bonds (Iowa Code 296.6 / 75.1)

For

—

Against

—

For %

55.4%

Needs 60% to pass

Lewis Central Comm School District

Capital levy · Mills, Pottawattamie

Passed

Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)

For

—

Against

—

For %

69.0%

Martensdale-St Marys Comm School District

Capital levy · Madison, Warren

Passed

Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)

For

—

Against

—

For %

78.0%

Orient-Macksburg Comm School District

Capital levy · Adair, Adams, Madison, Union

Passed

Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)

For

—

Against

—

For %

79.0%

Rock Valley Comm School District

Capital levy · Lyon, Sioux

Passed

Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)

For

—

Against

—

For %

65.0%

Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.