Iowa · School bond & tax election
March 2005 Results
11 tracked measures in this cycle—7 passed and 4 failed (64% passage rate), totaling $13.3M in approved bonds.
- Passed
- 7
- Failed
- 4
- Bond $ approved
- $13.3M
Full results
11 tracked measures · 7 passed · 4 failed.
Showing 11 of 11
Belmond-Klemme Comm School District
Capital levy · Franklin, Hancock, Wright
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
73.1%
Bond · Benton, Johnson, Linn · $29.5M
General obligation school bonds (Iowa Code 296.6 / 75.1)
For
—
Against
—
For %
59.8%
Needs 60% to pass
Bond · Benton, Johnson, Linn · $5.5M
General obligation school bonds (Iowa Code 296.6 / 75.1)
For
—
Against
—
For %
56.0%
Needs 60% to pass
Tax rate election · Crawford
Debt service levy above $2.70 per $1,000, up to $4.05 (Iowa Code 298.18)
For
—
Against
—
For %
36.0%
Needs 60% to pass
Bond · Crawford · $11.7M
General obligation school bonds (Iowa Code 296.6 / 75.1)
For
—
Against
—
For %
38.0%
Needs 60% to pass
East Buchanan Comm School District
Capital levy · Buchanan
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
69.0%
George-Little Rock Comm School District
Bond · Lyon, Osceola, Sioux · $4.4M
General obligation school bonds (Iowa Code 296.6 / 75.1)
For
—
Against
—
For %
62.8%
Needs 60% to pass
Graettinger Comm School District
Capital levy · Clay, Dickinson, Emmet, Palo Alto
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
73.0%
Capital levy · Butler
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
68.0%
North Cedar Comm School District
Bond · Cedar, Jones · $9.0M
General obligation school bonds (Iowa Code 296.6 / 75.1)
For
—
Against
—
For %
74.0%
Needs 60% to pass
North Cedar Comm School District
Tax rate election · Cedar, Jones
Debt service levy above $2.70 per $1,000, up to $4.05 (Iowa Code 298.18)
For
—
Against
—
For %
70.0%
Needs 60% to pass
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.