Iowa · School bond & tax election
February 2010 Results
11 tracked measures in this cycle—11 passed and 0 failed (100% passage rate), totaling $22.7M in approved bonds.
- Passed
- 11
- Failed
- 0
- Bond $ approved
- $22.7M
Full results
11 tracked measures · 11 passed · 0 failed.
Showing 11 of 11
Bond · Adams, Taylor · $5.7M
General obligation school bonds (Iowa Code 296.6 / 75.1)
For
—
Against
—
For %
82.0%
Needs 60% to pass
Dunkerton Comm School District
Capital levy · Black Hawk, Bremer
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
80.0%
Fredericksburg Comm School District
Bond · Chickasaw · $2.2M
General obligation school bonds (Iowa Code 296.6 / 75.1)
For
—
Against
—
For %
77.0%
Needs 60% to pass
Fredericksburg Comm School District
Bond · Chickasaw · $1.7M
General obligation school bonds (Iowa Code 296.6 / 75.1)
For
—
Against
—
For %
77.0%
Needs 60% to pass
Capital levy · Van Buren
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
51.0%
Mormon Trail Comm School District
Capital levy · Wayne
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
74.5%
Mount Vernon Comm School District
Capital levy · Johnson, Jones, Linn
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
70.0%
Spirit Lake Comm School District
Capital levy · Dickinson
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
56.0%
Capital levy · Bremer, Chickasaw, Fayette
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
72.0%
Webster City Comm School District
Bond · Hamilton, Webster, Wright · $13.1M
General obligation school bonds (Iowa Code 296.6 / 75.1)
For
—
Against
—
For %
87.0%
Needs 60% to pass
Winfield-Mt Union Comm School District
Capital levy · Des Moines, Henry, Louisa, Washington
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
64.0%
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.