Iowa · School bond & tax election
December 2012 Results
11 tracked measures in this cycle—8 passed and 3 failed (73% passage rate), totaling $13.3M in approved bonds.
- Passed
- 8
- Failed
- 3
- Bond $ approved
- $13.3M
Full results
11 tracked measures · 8 passed · 3 failed.
Showing 11 of 11
Center Point-Urbana Comm School District
Bond · Benton, Linn · $9.8M
General obligation school bonds (Iowa Code 296.6 / 75.1)
For
—
Against
—
For %
47.1%
Needs 60% to pass
East Sac County Comm School District
Capital levy · Carroll, Crawford, Sac
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
38.0%
Eldora-New Providence Comm School District
Capital levy · Grundy, Hardin, Marshall
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
53.0%
Fort Dodge Comm School District
Capital levy · Webster
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
44.6%
Bond · Boone, Story · $5.0M
General obligation school bonds (Iowa Code 296.6 / 75.1)
For
—
Against
—
For %
80.5%
Needs 60% to pass
Capital levy · Marshall, Tama
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
77.0%
Hubbard-Radcliffe Comm School District
Bond · Hardin · $8.4M
General obligation school bonds (Iowa Code 296.6 / 75.1)
For
—
Against
—
For %
61.7%
Needs 60% to pass
Odebolt-Arthur Comm School District
Capital levy · Sac
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
88.6%
Storm Lake Comm School District
Capital levy · Buena Vista
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
67.3%
Wapsie Valley Comm School District
Capital levy · Black Hawk, Bremer, Buchanan, Fayette
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
57.2%
West Central Comm School District
Capital levy · Fayette
Voted physical plant and equipment levy (VPPEL, Iowa Code 298.2)
For
—
Against
—
For %
82.3%
Compiled from public election records. Figures are unofficial and may be revised as official canvasses are completed.